Gas Flows in Europe

3 records loaded

Supply Statistics

Data for 2026.11.24

Supply from Norway
310,919,556
16.7% of total
Norway to Germany + Norway to GB + Norway to France and Belgium + Nybro
LNG
386,241,800
20.8% of total
LNG
UGS
594,161,000
32.0% of total
UGS
Production
301,687,518
16.2% of total
Production
Supply from Russia
142,436,256
7.7% of total
Kondratki + Durusu + Kiyikoy
Supply from Africa
85,593,775
4.6% of total
Mazara del Vallo + Gela + Tarifa + Almeria
Supply from Asia
37,198,483
2.0% of total
Kipoi + Kiri
Total Consumption: 1,858,238,388 Sm³/day
Live
TTF87.49€/MWh-4.56%|CEGH89.67€/MWh-4.10%|NBP217.42p/thm-4.55%|TTF87.49€/MWh-4.56%|CEGH89.67€/MWh-4.10%|NBP217.42p/thm-4.55%|

Latest Gas Prices

Live

Last record: 25.11.2026 14:00:00

TTF Spot
88.64
€/MWh
TTF Winter
56.05
€/MWh
CEGH Spot
90.55
€/MWh
CEGH Winter
91.85
€/MWh
NBP Spot
74.86
€/MWh
NBP Winter
48.11
€/MWh
EUR/USD
1.09

Gas Balance — Bulgaria

Data for 2026.11.24 · Values in Sm³/day

Inputs
Negru Voda 1
-16,732,741
Negru Voda 2,3
—
Malkochlar
10,187,389
S.Zagora
3,417,466
Strandzha 2
49,843,986
Consumption / Storage
Chiren
-3,216,551
Bulgaria consumption
9,588,270
Outputs
Ruse
951,100
Kireevo
31,632,483
Sidokastron
5,964,995
Jidilovo
1,427,430
Kalotina
103,786
Balance
Inputs − Consumption − Outputs
+264,587Sm³/d
Strandzha 2 − Kireevo
Strandzha 2 − Kireevo (Net flow to BG, RO, UA, GR and MK)
+18,211,503Sm³/d

Main Entrances into Europe — Hourly

Physical flow per hour at the main import entry points (ENTSOG Transparency Platform)

22/11 14:0022/11 20:0023/11 02:0023/11 08:0023/11 14:0023/11 20:0024/11 02:0024/11 10:0000.81.62.43.2
Dornum (NO→DE)
3.07MSm³/h
+3.5% vs 24h ago
Emden EPT1 (NO→DE)
0.000MSm³/h
-100.0% vs 24h ago
Dunkerque (NO→FR)
0.535MSm³/h
+10.0% vs 24h ago
Zeebrugge (NO→BE)
1.92MSm³/h
+2.2% vs 24h ago
Strandzha 2 (TR→BG)
2.32MSm³/h
+14.4% vs 24h ago
Kipoi / TAP (TR→GR)
1.55MSm³/h
-0.2% vs 24h ago
Mazara del Vallo (TN→IT)
2.59MSm³/h
-3.3% vs 24h ago
Almería / Medgaz (DZ→ES)
0.731MSm³/h
+3.1% vs 24h ago
Horgos (RS→HU)
0.951MSm³/h
+1.0% vs 24h ago

Calorific Value at Entry Points

Daily gross calorific value (kWh/Sm³) — ENTSOG Transparency Platform

Strandzha 2 (TR→BG)
Bulgartransgaz
10.723kWh/Sm³
2026-11-24
-0.013 vs prev.
Malkochlar (TR→BG)
Bulgartransgaz
10.723kWh/Sm³
2026-11-24
-0.013 vs prev.
Mazara del Vallo (TN→IT)
Snam Rete Gas
10.930kWh/Sm³
2026-11-24
-0.013 vs prev.
Emden EPT1 (NO→DE)
GTS
0.000kWh/Sm³
2026-11-24
-10.902 vs prev.
Kipoi / TAP (TR→GR)
TAP
10.943kWh/Sm³
2026-11-25
-0.001 vs prev.
Almería / Medgaz (DZ→ES)
Enagas
10.855kWh/Sm³
2026-11-22
-0.012 vs prev.
Dunkerque (NO→FR)
NaTran
10.619kWh/Sm³
2026-11-24
-0.017 vs prev.
Faxe / Baltic Pipe (NO→DK)
Energinet
11.078kWh/Sm³
2026-11-25
+0.071 vs prev.

UGS Storage Statistics

Current volume vs. 1 year ago by country (GSm³)

Latest data: 2026-11-23 · vs. 2025-11-23 (1 year prior)

Austria
5.98 GSm³(62.5%)
-1.74 GSm³(-22.6%)
prev: 7.72
▼ 32.3 MSm³/d
Belgium
0.52 GSm³(71.4%)
-0.21 GSm³(-28.8%)
prev: 0.73
▲ 1.6 MSm³/d
Bulgaria
0.47 GSm³(70.6%)
-0.08 GSm³(-14.0%)
prev: 0.55
▼ 3.0 MSm³/d
Croatia
0.34 GSm³(74.9%)
+0.12 GSm³(+51.6%)
prev: 0.23
▼ 2.5 MSm³/d
Empty by 08 Apr
Czechia
2.94 GSm³(68.1%)
-0.97 GSm³(-24.7%)
prev: 3.91
▼ 26.5 MSm³/d
Empty by 14 Mar
Denmark
0.66 GSm³(80.8%)
+0.10 GSm³(+17.8%)
prev: 0.56
▼ 8.1 MSm³/d
Empty by 13 Feb
France
8.53 GSm³(72.2%)
-2.02 GSm³(-19.1%)
prev: 10.54
▼ 112.6 MSm³/d
Empty by 07 Feb
Germany
13.18 GSm³(55.8%)
-3.73 GSm³(-22.1%)
prev: 16.91
▼ 137.8 MSm³/d
Empty by 27 Feb
Hungary
4.79 GSm³(74.1%)
+0.42 GSm³(+9.6%)
prev: 4.37
▼ 17.2 MSm³/d
Italy
16.45 GSm³(84.8%)
-0.95 GSm³(-5.5%)
prev: 17.39
▼ 91.7 MSm³/d
Netherlands
8.05 GSm³(58.6%)
-1.35 GSm³(-14.4%)
prev: 9.40
▼ 61.6 MSm³/d
Empty by 03 Apr
Poland
3.34 GSm³(94.9%)
+0.05 GSm³(+1.6%)
prev: 3.28
▼ 10.4 MSm³/d
Romania
2.67 GSm³(82.5%)
-0.36 GSm³(-11.9%)
prev: 3.02
▼ 11.9 MSm³/d
Slovakia
1.70 GSm³(48.4%)
-0.78 GSm³(-31.4%)
prev: 2.48
▼ 13.1 MSm³/d
Empty by 02 Apr
Spain
2.71 GSm³(79.2%)
-0.10 GSm³(-3.5%)
prev: 2.80
▼ 5.5 MSm³/d
UK
0.32 GSm³(33.9%)
-0.22 GSm³(-40.8%)
prev: 0.54
▼ 14.4 MSm³/d
Empty by 15 Dec
Ukraine
10.58 GSm³(40.2%)
+2.09 GSm³(+24.6%)
prev: 8.49
▼ 45.2 MSm³/d
Lithuania
1.20 GSm³(51.7%)
-0.18 GSm³(-12.9%)
prev: 1.38
▼ 2.1 MSm³/d
Türkiye
5.29 GSm³(84.0%)
+0.33 GSm³(+6.7%)
prev: 4.96
Portugal
0.33 GSm³(95.5%)
▲ 0.0 MSm³/d
Europe Total
90.04 GSm³(63.6%)
-9.39 GSm³(-9.4%)
prev: 99.43
▼ 594.2 MSm³/d

Storage Depletion Timeline

Countries projected to run empty before the end of the withdrawal season (15 April), at the latest reported withdrawal rate

UK
15 Dec 202622 d
France
07 Feb 202776 d
Denmark
13 Feb 202782 d
Germany
27 Feb 202796 d
Czechia
14 Mar 2027111 d
Slovakia
02 Apr 2027130 d
Netherlands
03 Apr 2027131 d
Croatia
08 Apr 2027136 d
2026-11-23Empty before 15 April 202715 Apr 2027

Gas Receiving Points Map

Showing Gas Receiving Points with known coordinates

AIS LNG Tanker Tracker

Live tanker positions in European waters (aisstream.io)

91 tankers
Live LNG & tanker positions via aisstream.io & tankermap.com · updates every ~90s · color: berthed, slow, underway

CEE Gas & LNG News

Latest gas & LNG stories from ceenergynews.com & oilprice.com & t.me/papagaz

6 gas & LNG stories· sources: ceenergynews.com, oilprice.com & t.me/papagaz
  • Газ-Батюшка1h ago
    ⛽️ Новак: Дефицит топлива закрывают импортомt.me/papagaz

    📝 Вице-премьер Александр Новак сообщил, что на российском топливном рынке сохраняется напряженность из-за плановых ремонтов ряда нефтеперерабатывающих заводов. Уточняется, что образовавшийся дефицит полностью компенсируется поставками из ближнего и дальнего зарубежья. Чиновник о

  • Oil & Gas2h ago
    KN Energies targets minority stake in Vietnamese LNG stationceenergynews.com

    Lithuanian LNG operator expands international operations into South Central Vietnam.

  • Газ-Батюшка3h ago
    🛢 Бюджет России готовят к снижению цены нефтиt.me/papagaz

    📝 Вице-премьер Антон Силуанов заявил на заседании Совета Федерации, что бюджет должен быть рассчитан на снижение мировых цен на углеводороды после прекращения конфликта США с Ираном. Глава Минфина отметил, что Россия столкнулась с более чем 35 тыс. санкций, поэтому государству н

  • Газ-Батюшка6h ago
    ⚡  ГЭХ дал ток Якутии: в работу введена первая ГТУ Южно-Якутской ТЭСt.me/papagaz

    📝  В посёлке Чульман Нерюнгринского района Республики Саха  запущена  первая газотурбинная установка мощностью 110 МВт строящейся Южно-Якутской ТЭС 📌  Проект реализован  ООО «Газпром энергохолдинг» . В мероприятии приняли участие министр энергетики РФ С

  • LNG7h ago
    Global LNG Supply Crunch Set to Spill Into 2027oilprice.com

    The global market for liquefied natural gas will remain relatively tight next year, Malaysia’s state energy major Petronas has forecast, noting the continued supply disruption in the Middle East, which will keep prices for LNG elevated. “Lo

  • Natural Gas9h ago
    Goldman Sachs Sees U.S. Natural Gas Demand Surging on Data Center Boomoilprice.com

    Data center proliferation will drive demand for natural gas in the United States over the next two years, Goldman Sachs has forecast, estimating that some 52 GW of new data center capacity could be added to the grid in 2028 alone. “Year-to-

Unavailabilities of Gas Facilities

Active Urgent Market Messages from ENTSOG Transparency Platform

90 active unavailability message(s) · Source: ENTSOG Transparency Platform

OperatorPoint / AssetDir.TypeEventPeriodUnavailableTechnicalRemarks
Gasunie Transport ServicesEmden EPT (GASSCO)EntryPlannedTransmission system unavailability
02 Dec 2026
→ 04 Dec 2026
1.54 MSm³/d3.83 MSm³/d

Planned Maintenance

Fluxys TENP GmbH———
02 Dec 2026
→ 02 Dec 2026
——

Fluxys TENP announces a scheduled maintenance on ICT infrastructure. Period: Wednesday, 02 December 2026, from 06:00 to 08:00 CET. Impact: Your (re)nomination messages will not be processed, please send them after the mentioned period; • Our confirmation messages will be sent as soon as our systems are operational again. As from this moment we are ready to process your (re)nomination messages; •Within-Day auctions or FCFS bookings on the PRISMA platform will not take place.

Fluxys Deutschland GmbH———
02 Dec 2026
→ 02 Dec 2026
——

Fluxys Deutschland announces a scheduled maintenance on ICT infrastructure. Period: Wednesday, 02 December 2026, from 06:00 to 08:00 CET. Impact: Your (re)nomination messages will not be processed, please send them after the mentioned period; • Our confirmation messages will be sent as soon as our systems are operational again. As from this moment we are ready to process your (re)nomination messages; •Within-Day auctions or FCFS bookings on the PRISMA platform will not take place.

Elering ASBalticconnectorEntryUnplannedCompressor station unavailability
30 Nov 2026
→ 04 Dec 2026
1.24 MSm³/d7.44 MSm³/d

Power outage due to power line maintenance.

Elering ASBalticconnectorExitUnplannedCompressor station unavailability
30 Nov 2026
→ 04 Dec 2026
1.96 MSm³/d6.72 MSm³/d

Power outage due to power line maintenance.

Snam Rete Gas SpA———
25 Nov 2026
→ 25 Nov 2026
——

Please be advised that the Provisional Balance data is now available on the Jarvis Portal.

NaTranOLTINGUEExitUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d25.97 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

NaTranSud-EstExitUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d95.13 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

NaTranNord-OuestExitUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d95.13 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

NaTranVIRTUALYSExitUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d45.15 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

NaTranOBERGAILBACHExitUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d40.90 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

NaTranAtlantiqueExitUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d95.13 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

NaTranAtlantiqueEntryUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d95.13 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

NaTranNord-EstExitUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d95.13 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

NaTranSud-EstExitUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d95.13 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

NaTranOLTINGUEExitUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d25.97 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

NaTranVIRTUALYSExitUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d45.15 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

NaTranOBERGAILBACHExitUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d40.90 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

NaTranNord-EstExitUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d95.13 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

NaTranNord-OuestExitUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d95.13 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

NaTranOBERGAILBACHExitUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d40.90 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

NaTranOLTINGUEExitUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d25.97 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

NaTranAtlantiqueExitUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d95.13 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

NaTranVIRTUALYSExitUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d45.15 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

NaTranNord-OuestExitUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d95.13 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

NaTranSud-EstExitUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d95.13 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

NaTranNord-EstExitUnplannedTransmission system unavailability
25 Nov 2026
→ 26 Nov 2026
0.00 MSm³/d95.13 MSm³/d

Congestion measures ongoing : backhaul capacities and all sales are interrupted. UIOLI is closed.

Fluxys Belgium———
25 Nov 2026
→ 26 Nov 2026
——

Brussels, 24.11.2026 - 17:20. Fluxys BELGIUM has activated overnomination at IP Virtualys-Entry. Overnomination is now possible for this IP for transport period 25.11.2026 - 06:00 - end of gas day.

Hellenic Gas Transmission System Operator S.A.———
16 Nov 2026
→ 04 Dec 2026
——

Parameters of the Annual LNG Planning for Years 2027-2041 are published in DESFA’s website.Users have to set the financial limits (for Transmission and LNG), on NCIS till 13.30 (EEST/EET) of the previous Day than the Day they wish to participate in the specific stage of the Auction. The same must be done for every day and on that the auction (that User submit bids for) is not closed.

AB Amber Grid———
14 Nov 2026
→ 12 Dec 2026
——

Dynamically calculated capacity for Klaipeda connection point for period from 2026-11-14 to 2026-12-11 is 5 041 667 kWh/h. Total Klaipeda connection point capacity for period from 2026-11-14 to 2026-12-11 is 121 000 008 kWh/d.

Fluxys Belgium SA/NVVIP THE-ZTPExitPlannedOther unavailability
09 Nov 2026
→ 28 Nov 2026
0.48 MSm³/d2.67 MSm³/d

Remaining capacity can be increased and duration window can be shortened during the maintenance UPDATE : As of gas day 16th Novermber: 28 GWh/h available (and still subject to potential future changes). UPDATE : As of gas day 17th Novermber: 30 GWh/h available (and still subject to potential future changes).

Thyssengas GmbHEmden EMS/ EPTEntryUnplannedCompressor station unavailability
01 Nov 2026
→ 01 Dec 2026
0.09 MSm³/d0.29 MSm³/d

maintenance at CS Hünxe

Open Grid Europe GmbHVIP Oberkappel Exit—UnplannedTransmission system unavailability
01 Nov 2026
→ 01 Dec 2026
9.49 MSm³/d20.46 MSm³/d

Capacity offer reduced / Suspension in monthly auction

Open Grid Europe GmbHVIP Oberkappel Entry—UnplannedTransmission system unavailability
01 Nov 2026
→ 01 Dec 2026
1.74 MSm³/d4.10 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHHaiming 2 7F Entry—UnplannedTransmission system unavailability
01 Nov 2026
→ 01 Dec 2026
4.62 MSm³/d11.00 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHEtzel (Speicher ESE),Bitzenlander Weg 3 Entry—UnplannedTransmission system unavailability
01 Nov 2026
→ 01 Dec 2026
1.92 MSm³/d18.17 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHFriedeburg-Etzel, Schienenstrang, EGL Entry—UnplannedTransmission system unavailability
01 Nov 2026
→ 01 Dec 2026
1.92 MSm³/d18.17 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHSpeicher Haiming 3-Haidach Entry—UnplannedTransmission system unavailability
01 Nov 2026
→ 01 Dec 2026
4.55 MSm³/d10.83 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHZone MND ESG Entry—UnplannedTransmission system unavailability
01 Nov 2026
→ 01 Dec 2026
0.09 MSm³/d0.89 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHSpeicher Breitbrunn Entry—UnplannedTransmission system unavailability
01 Nov 2026
→ 01 Dec 2026
10.09 MSm³/d24.00 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHSpeicher Bierwang Entry—UnplannedTransmission system unavailability
01 Nov 2026
→ 01 Dec 2026
10.09 MSm³/d24.00 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHSpeicher Gronau-Epe H4 Entry—UnplannedTransmission system unavailability
01 Nov 2026
→ 01 Dec 2026
1.19 MSm³/d11.24 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHSpeicher Gronau-Epe H1 Entry—UnplannedTransmission system unavailability
01 Nov 2026
→ 01 Dec 2026
1.19 MSm³/d11.24 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHSpeicher Epe H Entry—UnplannedTransmission system unavailability
01 Nov 2026
→ 01 Dec 2026
1.19 MSm³/d11.24 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHFriedeburg-Etzel, Bitzenlander Weg 2 Entry—UnplannedTransmission system unavailability
01 Nov 2026
→ 01 Dec 2026
1.92 MSm³/d18.17 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

terranets bw GmbHRC LindauExitPlannedOther unavailability
12 Oct 2026
→ 01 Apr 2027
0.01 MSm³/d0.10 MSm³/d

The reason for this is a national obligation by the NRA to reallocate capacities for upcoming auctions in the gas year.

terranets bw GmbHRC BaselExitPlannedOther unavailability
12 Oct 2026
→ 01 Oct 2027
0.00 MSm³/d0.03 MSm³/d

The reason for this is a national obligation by the NRA to reallocate capacities for upcoming auctions in the gas year.

GASCADE Gastransport GmbH———
05 Oct 2026
→ 01 Oct 2027
——

Maintenance works for GASCADE Gastransport GmbH: Later end date for ID 2026-030. The updated overview can be found under the following link: https://tron.gascade.biz/

GRTgaz DeutschlandVIP France - GermanyEntryUnplannedTransmission system unavailability
01 Oct 2026
→ 01 Oct 2029
7.73 MSm³/d7.73 MSm³/d

Due to the current transport situation or maintenance, the yearly auction will take place regarding the mentioned entry/exit points with a reduced capacity offer or will be suspended.

NaTran DeutschlandVIP France - GermanyEntryUnplannedTransmission system unavailability
01 Oct 2026
→ 01 Oct 2029
7.73 MSm³/d7.73 MSm³/d

Due to the current transport situation or maintenance, the day-ahead auction regarding the mentioned entry/exit points will take place with a reduced capacity offer or will be suspended on the mentioned days.

NaTran DeutschlandVIP France - GermanyEntryUnplannedTransmission system unavailability
01 Oct 2026
→ 01 Oct 2029
7.73 MSm³/d7.73 MSm³/d

Due to the current transport situation or maintenance, the rest-of-day auctions regarding the mentioned entry/exit points will take place with a reduced capacity offer or will be suspended on the mentioned days.

NaTran DeutschlandVIP France - GermanyEntryUnplannedTransmission system unavailability
01 Oct 2026
→ 01 Oct 2029
7.73 MSm³/d7.73 MSm³/d

Due to the current transport situation or maintenance, the monthly auction regarding the mentioned entry/exit points will take place with a reduced capacity offer or will be suspended.

FGSZ———
01 Oct 2026
→ 01 Apr 2027
——

FGSZ and GTSOU hereby announce that continuing their pilot project 5,390,871 kWh/h of technical firm capacity at the VIP Bereg (EIC 21Z000000000507L) will be offered in the direction of Hungary-Ukraine as of 1 October 2026 until the end of the gas day of 31 March 2027. For the above period Q, M, DA and within-day capacity products will be offered. The Q auction will run on 3 August 2026.

GASCADE Gastransport GmbH———
11 Sept 2026
→ 30 Sept 2027
——

Maintenance works for GASCADE Gastransport GmbH: New start and end date for ID 2026-030. The updated overview can be found under the following link: https://tron.gascade.biz/

GASCADE Gastransport GmbH———
11 Sept 2026
→ 20 Aug 2027
——

Maintenance works for GASCADE Gastransport GmbH: Cancellation of ID 2026-032. The updated overview can be found under the following link: https://tron.gascade.biz/

NET4GAS———
07 Sept 2026
→ 01 Jan 2027
——

Due to changes in the operation of the gas transmission system, NET4GAS will adjust the technical capacity at MND Gas Storage (EIC: 21Z000000000452K) and MND Energy Storage (EIC: 27ZG007-009Q001S), for both entry and exit directions, as of September 7, 2026.

GASCADE Gastransport GmbH———
26 Aug 2026
→ 02 Jul 2027
——

Maintenance works for GASCADE Gastransport GmbH: Later start and end date for ID 2026-031. The updated overview can be found under the following link: https://tron.gascade.biz/

ONTRAS Gastransport GmbH———
25 Aug 2026
→ 01 Jan 2027
——

ONTRAS Gastransport GmbH, with a reference to UMM ID 26052821X-DE-F-A0A0A-2001, informs that VIP THE-PL capacities will be marketed via GSA Platform. The first auction will be the monthly auction for January 2027 on 21 December 2026. Registration for ONTRAS on GSA Platform opens on 1 September 2026. The contracted capacity at Mallnow and GCP GAZ-SYSTEM/ONTRAS interconnection points will be transferred to the VIP THE-PL as of 1st January 2027, 06:00 a.m.

GASCADE Gastransport GmbH———
25 Aug 2026
→ 01 Jan 2027
——

GASCADE Gastransport GmbH, with a reference to UMM ID 26052821X-DE-H-A0A0A-L001, informs that VIP THE-PL capacities will be marketed via GSA Platform. The first auction will be the monthly auction for January 2027 on 21 December 2026. Registration for ONTRAS Gastransport GmbH on GSA Platform opens on 1 September 2026. . The contracted capacity at Mallnow and GCP GAZ-SYSTEM/ONTRAS interconnection points will be transferred to the VIP THE-PL as of 1st January 2027, 06:00 a.m.

NaTran———
12 Aug 2026
→ 28 Nov 2026
——

Due to Technical Issue at Roussines Station, Limits are impacted as following: SN0/SN1 : 30GWh NS4/S1: 50 GWh Remarks: Increase of the risk of call for tenders on the locational product on these limits during the period

FGSZ———
30 Jul 2026
→ 31 Dec 2026
——

With the future commissioning of Plinacro’s Bosiljevo–Sisak and Kozarac–Sisak pipelines, the technical capacity of Drávaszerdahely IP (EIC: 21Z000000000249H) in the HR>HU direction will increase from 200,000 to 400,000 m³/h. From 31 December 2026, the additional 200,000 m³/h will be available as interruptible capacity during trial operation; after the final use permit is issued, the full capacity will be offered as firm capacity.

bayernets———
23 Jun 2026
→ 31 Dec 2027
——

Im Preisblatt der bayernets für die Entgeltperiode 2027 wurden die Preise und Abschläge für die Punkte USP Haidach Entry, USP Haidach Exit, Haiming2-7F/bn Exit und Haiming 2-RAGES/bn teilweise angepasst. The prices and discounts for the points USP Haidach Entry, USP Haidach Exit, Haiming2-7F/bn Exit and Haiming 2-RAGES/bn in the price list of bayernets for the 2027 tariff period have been partially adjusted.

GASCADE Gastransport GmbH———
01 Jun 2026
→ 01 Jan 2027
——

GASCADE Gastransport GmbH informs that a new Virtual Interconnection Point (VIP) “VIP THE-PL” between the German market area (Trading Hub Europe – THE) and the Polish entry-exit system (comprising the Polish national transmission system and the TGPS transit pipeline system) will be established effective 1 January 2027, 06:00 CET. The VIP will be created by merging the existing interconnection points Mallnow and GCP GAZ-SYSTEM/ONTRAS. ONTRAS Gastransport GmbH will market capacities on the German side of the VIP. All capacities contracted with GASCADE at Mallnow up to this date will be transferred to VIP THE-PL as of 1 January 2027, 06:00 CET.

GASCADE Gastransport GmbH———
01 Jun 2026
→ 01 Jan 2028
——

The fees for firm and free assignable capacity with a booking period of one year amount to 7,31 €/kWh/h/a for the TRADING HUB EUROPE market area with effect from 01.01.2027.

ONTRAS Gastransport GmbH———
28 May 2026
→ 01 Jan 2027
——

"ONTRAS Gastransport GmbH informs that a new Virtual Interconnection Point (VIP) “VIP THE-PL” between the German market area (Trading Hub Europe – THE) and the Polish entry-exit system (comprising the Polish national transmission system and the TGPS transit pipeline system) will be established effective 1 January 2027, 06:00 CET. The VIP will be created by merging the existing interconnection points Mallnow and GCP GAZ-SYSTEM/ONTRAS. ONTRAS Gastransport GmbH will market capacities on the German side of the VIP. All capacities contracted with ONTRAS at GCP GAZ-SYSTEM/ONTRAS up to this date will be transferred to VIP THE-PL as of 1 January 2027, 06:00 CET."

NaTran———
22 May 2026
→ 01 Jan 2028
——

To preserve network safety, constraints are applied on the network operations. The limits are therefore reduced as follows: -SN1/SN0: 100 GWh -SN3/SN4: 30 GWh -NS3/EO2/NS4/S1: 10 GWh

Conexus Baltic Grid JSC———
01 May 2026
→ 01 May 2027
——

IUGS technical capacity for 2026./2027. years cycle is 24 405 300 000 kWh

terranets bw GmbH———
01 Jan 2026
→ 01 Jan 2027
——

The network fees for firm freely allocable capacities with a term of one gas year are 7,06 €/(kWh/h)/a in the Trading Hub Europe GmbH market area, valid from 1 January 2026 until 1 January 2027. The fees result from the BNetzA decision BK9-23/610 (REGENT 2026).

Open Grid Europe GmbH———
01 Jan 2026
→ 01 Jan 2027
——

OGE publishes network fees for 2026 (MA THE) - The network fees for firm freely allocable capacities with a term of one gas year are 7.06 €/(kWh/h)/a in the Trading Hub Europe GmbH market area, valid from 1 January 2026 until 1 January 2027.

Gasunie Deutschland Transport Services GmbH———
01 Jan 2026
→ 01 Jan 2027
——

GUD publishes network fees for 2026 (MA THE)The network fees for firm freely allocable capacities with a term of one gas year are 7.06 €/(kWh/h)/a in the Trading Hub Europe GmbH market area, valid from 1 January 2026 until 1 January 2027.The fees result from the BNetzA decision BK9-23/610 (REGENT 2026).

NaTran DeutschlandVIP France GermanyEntryUnplannedTransmission system unavailability
01 Jan 2026
→ 01 Jan 2027
0.00 MSm³/d0.00 MSm³/d

Die Entgelte ergeben sich gemäß der Festlegung der BNetzA BK9-23/610 (REGENT 2026).The fees result from the BNetzA decision BK9-23/610 (REGENT 2026).

NaTran DeutschlandVIP France GermanyExitUnplannedTransmission system unavailability
01 Jan 2026
→ 01 Jan 2027
0.00 MSm³/d0.00 MSm³/d

Die Entgelte ergeben sich gemäß der Festlegung der BNetzA BK9-23/610 (REGENT 2026).The fees result from the BNetzA decision BK9-23/610 (REGENT 2026).

GASCADE Gastransport GmbH———
01 Jan 2026
→ 01 Jan 2027
——

Die Netzentgelte für eine feste frei zuordenbare Kapazität mit einer Laufzeit von einem Jahr belaufen sich für das Marktgebiet TRADING HUB EUROPE auf 7,06 €/kWh/h/a mit Wirkung ab dem 01.01.2026.The fees for firm and free assignable capacity with a booking period of one year amount to 7,06 €/kWh/h/a for the TRADING HUB EUROPE market area with effect from 01.01.2026.

NEL Gastransport GmbH———
01 Jan 2026
→ 01 Jan 2027
——

Die Netzentgelte für eine feste frei zuordenbare Kapazität mit einer Laufzeit von einem Jahr belaufen sich für das Marktgebiet TRADING HUB EUROPE auf 7,06 €/kWh/h/a mit Wirkung ab dem 01.01.2026.The fees for firm and free assignable capacity with a booking period of one year amount to 7,06 €/kWh/h/a for the TRADING HUB EUROPE market area with effect from 01.01.2026.

Open Grid Europe GmbH———
01 Jan 2026
→ 01 Jan 2027
——

OGE publishes biogas levy 2026 - The German-wide levy 2026 according to Cooperation Agreement is for biogas 1.3268 €/(kWh/h)/a.

Open Grid Europe GmbH———
01 Jan 2026
→ 01 Jan 2027
——

OGE publishes market area conversion levy 2026 - The German-wide levy 2026 according to Cooperation Agreement is for market area conversion 0.7189 €/(kWh/h)/a.

NET4GAS———
01 Jan 2026
→ 01 Jan 2027
——

An initial outage plan for year 2026 has been published

NaTranPS000SAExitUnplannedTransmission system unavailability
28 Nov 2025
→ 31 Dec 2026
0.48 MSm³/d0.74 MSm³/d

From the GD of 28/11/2025, a reduction of the exit capacity for PITS Sud Est might be applied. This reduction could reach a maximum of 5 GWh/d.

Fluxys TENP GmbH———
31 Oct 2025
→ 31 Dec 2099
——

Düsseldorf, 31.10.2025 – 14:15 Fluxys TENP has activated the function to transfer nomination rights from an already existing "Transfer of Use"-deal to a further third party by means of a second "Transfer of Use"-deal on PRISMA. All involved parties must be registered with Fluxys TENP on PRISMA. Please contact us at "dispatching.fluxystenp@fluxys.com" in case of any question you may have. Düsseldorf, 31.10.2025 – 14:15 Fluxys TENP hat auf PRISMA die Möglichkeit aktiviert, Nominierungsrechte aus einem bereits bestehenden Übertragungsvertrag ("Transfer of Use") durch einen zweiten Übertragungsvertrag auf eine dritte Partei zu übertragen. Alle involvierten Parteien müssen dafür bei Fluxys TENP auf PRISMA registriert sein. Bei Fragen kontaktieren Sie uns gerne unter "dispatching.fluxystenp@fluxys.com".

NaTranSPNS2UEntryUnplannedCompressor station unavailability
02 May 2025
→ 01 Jan 2027
0.00 MSm³/d95.13 MSm³/d

Increase of the risk of call for tenders on the locational product on these limits during this period

Conexus Baltic Grid JSC———
01 Jan 2025
→ 01 Jan 2035
——

Default long-term injection and withdrawal capacities for Inčukalns UGS have been updated

GASCADE Gastransport GmbH———
23 Dec 2024
→ 01 Jan 2027
——

As of 23.12.2024 06:00 CET Fluxys Deutschland GmbH (Fluxys) and GASCADE Gastransport GmbH (GASCADE) will offer additional 4,000,000 kWh/h dynamically allocable capacity (DZK) at the LNG Entry point Baltic Energy Gate (EIC 37Z000000008921D), operated by Fluxys and GASCADE, with allocation restriction to Exit Mallnow (EIC 21Z000000000056S) and Exit VIP Brandov (EIC 21Z0000000004863). Fluxys will offer 25% of the additional capacity, GASCADE 75%. You can find all capacity information in the transparency section Fluxys’ and GASCADEs' websites.

Fluxys Deutschland GmbH———
23 Dec 2024
→ 01 Jan 2027
——

As of 23.12.2024 06:00 CET Fluxys Deutschland GmbH (Fluxys) and GASCADE Gastransport GmbH (GASCADE) will offer additional 4,000,000 kWh/h dynamically allocable capacity (DZK) at the LNG Entry point Baltic Energy Gate (EIC 37Z000000008921D) Entry, operated by Fluxys and GASCADE, with allocation restriction to Exit Mallnow (EIC 21Z000000000056S) and Exit VIP Brandov (EIC 21Z0000000004863). Fluxys will offer 25% of the additional capacity, GASCADE 75%. You can find all capacity information in the transparency section Fluxys’ and GASCADE’s websites.

terranets bw GmbHRC BaselExitPlannedOther unavailability
01 Oct 2024
→ 01 Oct 2030
0.01 MSm³/d0.04 MSm³/d

terranets bw will reduce the exit capacity at IP Basel beginning from October 1st 2024 permanently by 102222 kWh/h. The reason for this is a national obligation by the NRA to reallocate capacities for upcoming auctions.

GASCADE Gastransport GmbH———
01 Oct 2024
→ 01 Oct 2029
——

GASCADE will change the technical capacities for the network points Mallnow and VIP Brandov starting from 01 October 2024 06:00 a.m. (CET) which will be the basis for the capacity offer at those points in the Annual Yearly Auction 2024.For further information please refer to the publication on GASCADE’s transparency platform (https://tron.gascade.biz/?language=en) as well as on the ENTSOG TP.

GASCADE Gastransport GmbH———
01 Oct 2024
→ 01 Oct 2029
——

In the Annual Yearly Auction 2024, GASCADE will offer technical capacities for the network point Greifswald (former Greifswald OPAL point) starting from 01 October 2024 06:00 a.m. (CET).

Elering ASVärska EntryEntryPlannedTransmission system unavailability
30 Dec 2022
→ 31 Dec 2029
4.01 MSm³/d4.01 MSm³/d

Not new UMM, original from https://umm.getbaltic.com/public-umm/3470

Elering AS———
23 Sept 2022
→ 27 Apr 2031
——

The technical maximum capacity of the Paldiski LNG entry point will be between 90 GWh and 120GWh during normal operation. The normal operating capacity is dependent on the Finnish and Estonian consumption levels and Latvian network regimes. This is not new UMM, original https://umm.getbaltic.com/public-umm/3128

Open Grid Europe———
01 Oct 2021
→ 01 Jan 2030
——

Reduction of firm capacities for yearly auction (01.07.2019): OGE will not offer any firm freely allocable capacities at entry points (Entry-FZK) within the H-Gas market area in the yearly auction from 01.10.2021 onwards. Only interruptible capacities at entry points will be offered for a period of five years.

Open Grid Europe———
01 Oct 2021
→ 01 Jan 2030
——

Reduction of capacities for yearly auction (01.07.2019): Open Grid Europe will not offer any conditionally firm freely allocable capacities at entry points (Entry-bFZK) at Virtual Interconnection Points. This limitation refers to capacities within the H-Gas market area for the period starting on 01.10.2021.

Subscribe to Access

Get full access to real-time European gas flow data, LNG terminals, market prices and more.

View Plans & Start Free Trial

7-day free trial · No credit card required upfront

Data is collected on a daily basis from open resources such as ENTSOG, GIE (AGSI, ALSI) and the websites of TSOs.