Gas Flows in Europe

3 records loaded

Supply Statistics

Data for 2026.09.30

Supply from Norway
331,461,608
37.9% of total
LNG
321,581,900
36.8% of total
UGS
-239,614,000
-27.4% of total
Production
240,250,527
27.5% of total
Supply from Russia
100,004,498
11.4% of total
Supply from Africa
85,363,012
9.8% of total
Supply from Asia
35,780,317
4.1% of total
Total Consumption: 874,827,862 Sm³/day
Live
TTF73.21€/MWh+1.18%|CEGH75.35€/MWh+1.99%|NBP186.53p/thm+1.88%|TTF73.21€/MWh+1.18%|CEGH75.35€/MWh+1.99%|NBP186.53p/thm+1.88%|

Latest Gas Prices

Live

Last record: 01.10.2026 14:00:00

TTF Spot
73.39
€/MWh
TTF Winter
49.71
€/MWh
CEGH Spot
75.50
€/MWh
CEGH Winter
—
€/MWh
NBP Spot
—
€/MWh
NBP Winter
—
€/MWh
EUR/USD
1.13

Gas Balance — Bulgaria

Data for 2026.09.30 · Values in Sm³/day

Inputs
Negru Voda 1
-13,350,897
Negru Voda 2,3
—
Malkochlar
4,498,056
S.Zagora
3,614,808
Strandzha 2
51,033,318
Consumption / Storage
Chiren
3,935,939
Bulgaria consumption
5,806,937
Outputs
Ruse
229,829
Kireevo
28,261,404
Sidokastron
5,181,076
Jidilovo
494,028
Kalotina
106,658
Balance
Inputs − Consumption − Outputs
+1,779,414Sm³/d
Strandzha 2 − Kireevo
Strandzha 2 − Kireevo (Net flow to BG, RO, UA, GR and MK)
+22,771,914Sm³/d

Main Entrances into Europe — Hourly

Physical flow per hour at the main import entry points (ENTSOG Transparency Platform)

29/09 23:0030/09 06:0030/09 13:0030/09 20:0001/10 03:0001/10 09:0001/10 17:0000.751.52.253
Dornum (NO→DE)
2.70MSm³/h
+9.2% vs 24h ago
Emden EPT1 (NO→DE)
1.49MSm³/h
-3.3% vs 24h ago
Dunkerque (NO→FR)
1.91MSm³/h
-7.7% vs 24h ago
Zeebrugge (NO→BE)
1.85MSm³/h
-2.2% vs 24h ago
Strandzha 2 (TR→BG)
1.94MSm³/h
-10.6% vs 24h ago
Kipoi / TAP (TR→GR)
1.53MSm³/h
+2.8% vs 24h ago
Mazara del Vallo (TN→IT)
2.37MSm³/h
-3.7% vs 24h ago
Almería / Medgaz (DZ→ES)
1.21MSm³/h
-2.8% vs 24h ago
Horgos (RS→HU)
0.980MSm³/h
+0.1% vs 24h ago

UGS Storage Statistics

Current volume vs. 1 year ago by country (GSm³)

Latest data: 2026-09-29 · vs. 2025-09-29 (1 year prior)

Austria
6.52 GSm³(68.2%)
-1.64 GSm³(-20.1%)
prev: 8.16
▲ 6.0 MSm³/d
Belgium
0.45 GSm³(62.0%)
-0.36 GSm³(-44.2%)
prev: 0.81
▲ 1.9 MSm³/d
Bulgaria
0.52 GSm³(77.5%)
-0.02 GSm³(-3.0%)
prev: 0.54
▲ 4.2 MSm³/d
Croatia
0.40 GSm³(87.4%)
+0.05 GSm³(+13.7%)
prev: 0.35
▲ 2.3 MSm³/d
Czechia
3.31 GSm³(76.5%)
-0.86 GSm³(-20.6%)
prev: 4.16
▲ 10.3 MSm³/d
Denmark
0.63 GSm³(76.7%)
+0.16 GSm³(+33.1%)
prev: 0.47
▼ 0.5 MSm³/d
France
9.86 GSm³(83.4%)
-1.12 GSm³(-10.2%)
prev: 10.98
▲ 29.0 MSm³/d
Germany
13.67 GSm³(58.1%)
-4.62 GSm³(-25.3%)
prev: 18.29
▲ 44.9 MSm³/d
Hungary
4.88 GSm³(75.5%)
+0.14 GSm³(+3.0%)
prev: 4.74
▲ 16.9 MSm³/d
Italy
16.89 GSm³(87.1%)
-0.97 GSm³(-5.5%)
prev: 17.87
▲ 26.3 MSm³/d
Netherlands
8.04 GSm³(58.6%)
-1.62 GSm³(-16.8%)
prev: 9.66
▲ 53.5 MSm³/d
Poland
3.48 GSm³(98.9%)
-0.00 GSm³(-0.1%)
prev: 3.48
▲ 3.7 MSm³/d
Romania
2.63 GSm³(81.6%)
-0.41 GSm³(-13.5%)
prev: 3.05
▲ 10.9 MSm³/d
Slovakia
1.90 GSm³(54.3%)
-0.67 GSm³(-26.1%)
prev: 2.58
▲ 4.2 MSm³/d
Spain
2.55 GSm³(74.5%)
-0.42 GSm³(-14.0%)
prev: 2.96
▲ 7.0 MSm³/d
UK
0.29 GSm³(31.4%)
-0.16 GSm³(-34.4%)
prev: 0.45
▲ 0.0 MSm³/d
Ukraine
11.11 GSm³(42.2%)
+2.91 GSm³(+35.5%)
prev: 8.20
▲ 18.1 MSm³/d
Lithuania
1.14 GSm³(48.9%)
-0.18 GSm³(-13.8%)
prev: 1.32
▲ 1.0 MSm³/d
Türkiye
5.41 GSm³(85.9%)
+0.46 GSm³(+9.3%)
prev: 4.95
Portugal
0.32 GSm³(94.0%)
▲ 0.0 MSm³/d
Europe Total
93.99 GSm³(66.5%)
-9.01 GSm³(-8.7%)
prev: 103.00
▲ 239.6 MSm³/d

Gas Receiving Points Map

Showing Gas Receiving Points with known coordinates

AIS LNG Tanker Tracker

Live tanker positions in European waters (aisstream.io)

71 tankers
Live LNG & tanker positions via aisstream.io & tankermap.com · updates every ~90s · color: berthed, slow, underway

CEE Gas & LNG News

Latest gas & LNG stories from ceenergynews.com & oilprice.com & t.me/papagaz

3 gas & LNG stories· sources: ceenergynews.com, oilprice.com & t.me/papagaz
  • Газ-Батюшка5h ago
    📈 В России с сегодняшнего дня выросла оптовая цена на газt.me/papagaz

    📰 С 1 октября 2026 года оптовые цены на газ для всех потребителей, включая население, повышены на 9,6%. ℹ️ Это уже второе повышение тарифов за 2026 год. С 1 января они индексировались на 1,7% в связи с повышением ставки НДС. Изначально основную индексацию планировали провести с

  • Oil & Gas9h ago
    Russian-Serbian gas agreement extendedceenergynews.com

    Russia supplies around 75 per cent of Serbia's annual gas demand at a "preferential price".

  • LNG11h ago
    Pakistan Weighs Direct LNG Imports for Power Plants to Ease Energy Crisisoilprice.com

    Pakistan’s government is considering allowing power plants and private firms to directly import LNG procured on the spot market as the country has been struggling with an energy crisis since the Iran war crippled Qatar’s term supplies. Paki

Unavailabilities of Gas Facilities

Active Urgent Market Messages from ENTSOG Transparency Platform

154 active unavailability message(s) · Source: ENTSOG Transparency Platform

OperatorPoint / AssetDir.TypeEventPeriodUnavailableTechnicalRemarks
Conexus Baltic Grid JSC———
15 Oct 2026
→ 01 May 2027
——

Inčukalns UGS withdrawal capacity has been reviewed for the 2026/2027 withdrawal season and remained unchanged for the 2026/2027 injectionl season.

AB Amber GridKlaipeda LNG Terminal FSRU IndependenceEntryPlannedTransmission system unavailability
15 Oct 2026
→ 23 Oct 2026
7.23 MSm³/d11.13 MSm³/d

Maintenance works.

Plinovodi d.o.o.ŠempeterEntryPlannedTransmission system unavailability
15 Oct 2026
→ 19 Oct 2026
3.74 MSm³/d3.74 MSm³/d

Due to maintenance work on the M3 gas pipeline (KPA - MMRP Šempeter), the available entry and exit transmission capacity via the interconnection point Šempeter will be reduced to 0 kWh/h in the entry and exit directions during the specified period.

Plinovodi d.o.o.ŠempeterExitPlannedTransmission system unavailability
15 Oct 2026
→ 19 Oct 2026
2.48 MSm³/d2.48 MSm³/d

Due to maintenance work on the M3 gas pipeline (KPA - MMRP Šempeter), the available entry and exit transmission capacity via the interconnection point Šempeter will be reduced to 0 kWh/h in the entry and exit directions during the specified period.

Open Grid Europe GmbHVIP Oberkappel Entry—UnplannedTransmission system unavailability
15 Oct 2026
→ 16 Oct 2026
6.74 MSm³/d6.74 MSm³/d

Rest-of-day capacity offer reduced / auction suspended

Open Grid Europe GmbHVIP Oberkappel Entry—UnplannedTransmission system unavailability
15 Oct 2026
→ 16 Oct 2026
4.10 MSm³/d4.10 MSm³/d

Rest-of-day capacity offer reduced / auction suspended bFZK

Open Grid Europe GmbHVIP Oberkappel Entry—UnplannedTransmission system unavailability
15 Oct 2026
→ 16 Oct 2026
6.74 MSm³/d6.74 MSm³/d

Day-ahead capacity offer reduced / auction suspended

Open Grid Europe GmbHVIP Oberkappel Entry—UnplannedTransmission system unavailability
15 Oct 2026
→ 16 Oct 2026
4.10 MSm³/d4.10 MSm³/d

Day-Ahead capacity offer reduced / auction suspended (bFZK)

Open Grid Europe GmbHVIP Oberkappel Exit—UnplannedTransmission system unavailability
15 Oct 2026
→ 16 Oct 2026
9.49 MSm³/d20.46 MSm³/d

Day-ahead capacity offer reduced / auction suspended

Open Grid Europe GmbHVIP Oberkappel Exit—UnplannedTransmission system unavailability
15 Oct 2026
→ 16 Oct 2026
9.49 MSm³/d20.46 MSm³/d

Rest-of-day capacity offer reduced / auction suspended

Open Grid Europe GmbHVIP Oberkappel Entry—UnplannedTransmission system unavailability
13 Oct 2026
→ 15 Oct 2026
6.74 MSm³/d6.74 MSm³/d

Rest-of-day capacity offer reduced / auction suspended

Open Grid Europe GmbHVIP Oberkappel Entry—UnplannedTransmission system unavailability
13 Oct 2026
→ 15 Oct 2026
6.74 MSm³/d6.74 MSm³/d

Day-ahead capacity offer reduced / auction suspended

Open Grid Europe GmbHVIP Oberkappel Entry—UnplannedTransmission system unavailability
13 Oct 2026
→ 15 Oct 2026
4.10 MSm³/d4.10 MSm³/d

Day-Ahead capacity offer reduced / auction suspended (bFZK)

Open Grid Europe GmbHVIP Oberkappel Entry—UnplannedTransmission system unavailability
13 Oct 2026
→ 15 Oct 2026
4.10 MSm³/d4.10 MSm³/d

Rest-of-day capacity offer reduced / auction suspended bFZK

Open Grid Europe GmbHVIP Oberkappel Exit—UnplannedTransmission system unavailability
13 Oct 2026
→ 15 Oct 2026
9.49 MSm³/d20.46 MSm³/d

Day-ahead capacity offer reduced / auction suspended

Open Grid Europe GmbHVIP Oberkappel Exit—UnplannedTransmission system unavailability
13 Oct 2026
→ 15 Oct 2026
9.49 MSm³/d20.46 MSm³/d

Rest-of-day capacity offer reduced / auction suspended

Open Grid Europe GmbHVIP Oberkappel Exit—PlannedTransmission system unavailability
13 Oct 2026
→ 15 Oct 2026
10.96 MSm³/d10.96 MSm³/d

Maintenance with notification period shorter than required under Annex I, point 3.3.1 g) of Regulation (EU) 2024/1789

Open Grid Europe GmbHVIP Oberkappel Entry—PlannedTransmission system unavailability
13 Oct 2026
→ 15 Oct 2026
0.00 MSm³/d0.00 MSm³/d

Maintenance with notification period shorter than required under Annex I, point 3.3.1 g) of Regulation (EU) 2024/1789

Hellenic Gas Transmission System Operator S.A.SIDIROKASTROExitPlannedCompressor station unavailability
13 Oct 2026
→ 15 Oct 2026
5.27 MSm³/d8.89 MSm³/d

Transmission Capacity for Reception of Reverse Flow at Exit Point 'SIDIROKASTRO': 38,000,000 kWh/Day.

terranets bw GmbH———
12 Oct 2026
→ 12 Oct 2026
——

Due to internal system upgrades, there will be an outage in market communications on October 12, 2026, from 11:00 a.m. to 1:00 p.m. Incoming and outgoing messages will be confirmed and sent once the system upgrade is complete.

Hellenic Gas Transmission System Operator S.A.SIDIROKASTROEntryPlannedCompressor station unavailability
12 Oct 2026
→ 15 Oct 2026
8.39 MSm³/d11.44 MSm³/d

'-

Hellenic Gas Transmission System Operator S.A.NEA MESIMVRIAEntryPlannedCompressor station unavailability
12 Oct 2026
→ 15 Oct 2026
3.01 MSm³/d4.25 MSm³/d

'-

Hellenic Gas Transmission System Operator S.A.AMFITRITIEntryPlannedCompressor station unavailability
12 Oct 2026
→ 15 Oct 2026
4.53 MSm³/d4.53 MSm³/d

Transmission Capacity for Delivery at Entry Point 'AMFITRITI' to VTP: 0 kWh/Day.

Hellenic Gas Transmission System Operator S.A.SIDIROKASTROExitPlannedCompressor station unavailability
12 Oct 2026
→ 13 Oct 2026
8.89 MSm³/d8.89 MSm³/d

Transmission Capacity for Reception of Reverse Flow at Exit Point 'SIDIROKASTRO': 0 kWh/Day.

Open Grid Europe GmbHWilhelmshaven, LNG-Zone Entry—UnplannedTransmission system unavailability
11 Oct 2026
→ 24 Oct 2026
14.88 MSm³/d27.93 MSm³/d

FCFS capacity offer reduced / suspended

Open Grid Europe GmbHDornum Entry—UnplannedTransmission system unavailability
09 Oct 2026
→ 11 Oct 2026
8.58 MSm³/d39.73 MSm³/d

Rest-of-day capacity offer reduced / auction suspended

Open Grid Europe GmbHEmden EPT Entry—UnplannedTransmission system unavailability
09 Oct 2026
→ 11 Oct 2026
1.14 MSm³/d24.70 MSm³/d

Rest-of-day capacity offer reduced / auction suspended

Open Grid Europe GmbHWilhelmshaven, LNG-Zone Entry—UnplannedTransmission system unavailability
09 Oct 2026
→ 11 Oct 2026
2.86 MSm³/d27.93 MSm³/d

FCFS capacity offer reduced / suspended

Open Grid Europe GmbHDornum Entry—UnplannedTransmission system unavailability
09 Oct 2026
→ 11 Oct 2026
8.58 MSm³/d39.73 MSm³/d

Day-ahead capacity offer reduced / auction suspended

Open Grid Europe GmbHEmden EPT Entry—UnplannedTransmission system unavailability
09 Oct 2026
→ 11 Oct 2026
1.14 MSm³/d24.70 MSm³/d

Day-ahead capacity offer reduced / auction suspended

Plinovodi d.o.o.ŠempeterEntryPlannedTransmission system unavailability
08 Oct 2026
→ 12 Oct 2026
3.74 MSm³/d3.74 MSm³/d

Due to maintenance work on the M3 gas pipeline (KPA - MMRP Šempeter), the available entry and exit transmission capacity via the interconnection point Šempeter will be reduced to 0 kWh/h in the entry and exit directions during the specified period.

Plinovodi d.o.o.ŠempeterExitPlannedTransmission system unavailability
08 Oct 2026
→ 12 Oct 2026
2.48 MSm³/d2.48 MSm³/d

Due to maintenance work on the M3 gas pipeline (KPA - MMRP Šempeter), the available entry and exit transmission capacity via the interconnection point Šempeter will be reduced to 0 kWh/h in the entry and exit directions during the specified period.

Snam Rete Gas SpA31334701 - Gazzo Veronese VR - Redelivery Poin—UnplannedTransmission system unavailability
08 Oct 2026
→ 08 Oct 2026
0.17 MSm³/d0.17 MSm³/d

PIPELINE MAINTENANCE WORKS AFFECTING PDR 31334701 WILL TAKE PLACE ON 08/10/2026 . THE CAPACITY WILL NOT BE AVAILABLE.

NET4GAS———
06 Oct 2026
→ 06 Oct 2026
——

System unavailability due to system update. Full system services inaccessibility in the defined interval (including B2B automated communications). Expected resolution within 2 hours.

bayernets———
05 Oct 2026
→ 08 Oct 2026
——

All entry and exit flows are interrupted due to maintenance at Inzenham station. The affected capacity products are FZK, bFZK and Interruptible. If you have any questions, please contact market@bayernets.de.

Open Grid Europe GmbHWilhelmshaven, LNG-Zone Entry—UnplannedTransmission system unavailability
05 Oct 2026
→ 09 Oct 2026
1.03 MSm³/d27.93 MSm³/d

FCFS capacity offer reduced / suspended

Open Grid Europe GmbHDornum Entry—UnplannedTransmission system unavailability
05 Oct 2026
→ 09 Oct 2026
10.41 MSm³/d39.73 MSm³/d

Day-ahead capacity offer reduced / auction suspended

Open Grid Europe GmbHEmden EPT Entry—UnplannedTransmission system unavailability
05 Oct 2026
→ 09 Oct 2026
1.14 MSm³/d24.70 MSm³/d

Day-ahead capacity offer reduced / auction suspended

Open Grid Europe GmbHDornum Entry—UnplannedTransmission system unavailability
05 Oct 2026
→ 09 Oct 2026
10.41 MSm³/d39.73 MSm³/d

Rest-of-day capacity offer reduced / auction suspended

Open Grid Europe GmbHEmden EPT Entry—UnplannedTransmission system unavailability
05 Oct 2026
→ 09 Oct 2026
1.14 MSm³/d24.70 MSm³/d

Rest-of-day capacity offer reduced / auction suspended

Open Grid Europe GmbHZone MND ESG Exit—UnplannedTransmission system unavailability
05 Oct 2026
→ 17 Oct 2026
1.22 MSm³/d3.12 MSm³/d

Day-Ahead capacity offer reduced / auction suspended (bFZK)

Open Grid Europe GmbHZone MND ESG Entry—UnplannedTransmission system unavailability
05 Oct 2026
→ 17 Oct 2026
0.30 MSm³/d0.89 MSm³/d

Day-Ahead capacity offer reduced / auction suspended (bFZK)

Open Grid Europe GmbHZone MND ESG Exit—UnplannedTransmission system unavailability
05 Oct 2026
→ 17 Oct 2026
1.22 MSm³/d3.12 MSm³/d

Rest-of-day capacity offer reduced / auction suspended bFZK

Open Grid Europe GmbHZone MND ESG Entry—UnplannedTransmission system unavailability
05 Oct 2026
→ 17 Oct 2026
0.30 MSm³/d0.89 MSm³/d

Rest-of-day capacity offer reduced / auction suspended bFZK

Gasunie Deutschland Transport Services GmbHVIP TTF-THE-HEntryPlannedOther unavailability
05 Oct 2026
→ 11 Oct 2026
0.10 MSm³/d0.20 MSm³/d

Due to Maintenance work there is a reduction of DZK capacity.

Gasunie Deutschland Transport Services GmbHEMDEN - EPT1EntryUnplannedOther unavailability
05 Oct 2026
→ 06 Oct 2026
0.20 MSm³/d0.84 MSm³/d

Due to shortterm maintenance work, the capacity is reduced. Marketable capacity is still available.

Hellenic Gas Transmission System Operator S.A.AGIA TRIADAEntryPlannedRegasification plant unavailability
03 Oct 2026
→ 05 Oct 2026
21.42 MSm³/d21.42 MSm³/d

Gasification Capacity of LNG Facility: 0 kWh/Day

Hellenic Gas Transmission System Operator S.A.AGIA TRIADAEntryPlannedRegasification plant unavailability
02 Oct 2026
→ 03 Oct 2026
19.04 MSm³/d21.42 MSm³/d

Gasification Capacity of LNG Facility: 25.000.000 kWh/Day

Fluxys Belgium———
02 Oct 2026
→ 03 Oct 2026
——

Brussels, 01.10.2026 - 17:20. Fluxys BELGIUM has activated overnomination at IP VIP THE-ZTP-Exit. Overnomination is now possible for this IP for transport period 02.10.2026 - 06:00 - end of gas day.

Fluxys Belgium———
02 Oct 2026
→ 03 Oct 2026
——

Brussels, 01.10.2026 - 17:20. Fluxys BELGIUM has activated overnomination at IP Virtualys-Entry. Overnomination is now possible for this IP for transport period 02.10.2026 - 06:00 - end of gas day.

Gastransport Nord GmbHZone UGS EWE L-GasEntryUnplannedTransmission system unavailability
01 Oct 2026
→ 02 Oct 2026
0.08 MSm³/d0.11 MSm³/d

Please be informed that our network is actual congested. Interruptible contracts (L-gas) must be interrupted several times due to oversupply.

GRTgaz DeutschlandVIP France - GermanyEntryUnplannedTransmission system unavailability
01 Oct 2026
→ 01 Oct 2029
7.73 MSm³/d7.73 MSm³/d

Due to the current transport situation or maintenance, the yearly auction will take place regarding the mentioned entry/exit points with a reduced capacity offer or will be suspended.

GASCADE Gastransport GmbH———
01 Oct 2026
→ 31 Oct 2026
——

Maintenance works for GASCADE Gastransport GmbH: Cancellation of ID 2025-064. The updated overview can be found under the following link: https://tron.gascade.biz/

NaTran DeutschlandVIP France - GermanyEntryUnplannedTransmission system unavailability
01 Oct 2026
→ 01 Oct 2029
7.73 MSm³/d7.73 MSm³/d

Due to the current transport situation or maintenance, the day-ahead auction regarding the mentioned entry/exit points will take place with a reduced capacity offer or will be suspended on the mentioned days.

NaTran DeutschlandVIP France - GermanyEntryUnplannedTransmission system unavailability
01 Oct 2026
→ 01 Oct 2029
7.73 MSm³/d7.73 MSm³/d

Due to the current transport situation or maintenance, the rest-of-day auctions regarding the mentioned entry/exit points will take place with a reduced capacity offer or will be suspended on the mentioned days.

NaTran DeutschlandVIP France - GermanyEntryUnplannedTransmission system unavailability
01 Oct 2026
→ 01 Oct 2029
7.73 MSm³/d7.73 MSm³/d

Due to the current transport situation or maintenance, the monthly auction regarding the mentioned entry/exit points will take place with a reduced capacity offer or will be suspended.

Fluxys Belgium SA/NVVIP THE-ZTPExitPlannedOther unavailability
01 Oct 2026
→ 23 Oct 2026
0.76 MSm³/d2.67 MSm³/d

Remaining capacity can be increased and duration window can be shortened during the maintenance

Fluxys Belgium SA/NVVIP-BENEExitPlannedOther unavailability
01 Oct 2026
→ 23 Oct 2026
1.88 MSm³/d2.54 MSm³/d

Remaining capacity can be increased and duration window can be shortened during the maintenance

FGSZ———
01 Oct 2026
→ 01 Apr 2027
——

FGSZ and GTSOU hereby announce that continuing their pilot project 5,390,871 kWh/h of technical firm capacity at the VIP Bereg (EIC 21Z000000000507L) will be offered in the direction of Hungary-Ukraine as of 1 October 2026 until the end of the gas day of 31 March 2027. For the above period Q, M, DA and within-day capacity products will be offered. The Q auction will run on 3 August 2026.

Gasunie Deutschland Transport Services GmbHVIP DK-THEExitPlannedOther unavailability
01 Oct 2026
→ 31 Oct 2026
0.38 MSm³/d0.38 MSm³/d

Due to maintenance work, capacity is reduced.

Gasunie Deutschland Transport Services GmbHUGS LESUM HEntryPlannedOther unavailability
01 Oct 2026
→ 31 Oct 2026
0.10 MSm³/d0.19 MSm³/d

Due to maintenance work, capacity is reduced.

Open Grid Europe GmbHVIP Oberkappel Entry—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
6.74 MSm³/d6.74 MSm³/d

Capacity offer reduced / Suspension in monthly auction

Open Grid Europe GmbHVIP Oberkappel Entry—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
4.10 MSm³/d4.10 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHVIP Oberkappel Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
9.49 MSm³/d20.46 MSm³/d

Capacity offer reduced / Suspension in monthly auction

Open Grid Europe GmbHWilhelmshaven, LNG-Zone Entry—UnplannedTransmission system unavailability
01 Oct 2026
→ 02 Oct 2026
0.23 MSm³/d27.93 MSm³/d

FCFS capacity offer reduced / suspended

Open Grid Europe GmbHDornum Entry—UnplannedTransmission system unavailability
01 Oct 2026
→ 02 Oct 2026
11.44 MSm³/d39.73 MSm³/d

Day-ahead capacity offer reduced / auction suspended

Open Grid Europe GmbHEmden EPT Entry—UnplannedTransmission system unavailability
01 Oct 2026
→ 02 Oct 2026
1.14 MSm³/d24.70 MSm³/d

Day-ahead capacity offer reduced / auction suspended

Open Grid Europe GmbHDornum Entry—UnplannedTransmission system unavailability
01 Oct 2026
→ 02 Oct 2026
11.44 MSm³/d39.73 MSm³/d

Rest-of-day capacity offer reduced / auction suspended

Open Grid Europe GmbHEmden EPT Entry—UnplannedTransmission system unavailability
01 Oct 2026
→ 02 Oct 2026
1.14 MSm³/d24.70 MSm³/d

Rest-of-day capacity offer reduced / auction suspended

Open Grid Europe GmbHDornum Entry—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
11.44 MSm³/d39.73 MSm³/d

Capacity offer reduced / Suspension in monthly auction

Open Grid Europe GmbHEmden EPT Entry—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
1.14 MSm³/d24.70 MSm³/d

Capacity offer reduced / Suspension in monthly auction

Open Grid Europe GmbHSpeicher Haiming 3-Haidach Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 02 Oct 2026
1.38 MSm³/d9.98 MSm³/d

Day-Ahead capacity offer reduced / auction suspended (bFZK)

Open Grid Europe GmbHHaiming 2 7F Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 02 Oct 2026
1.04 MSm³/d7.52 MSm³/d

Day-Ahead capacity offer reduced / auction suspended (bFZK)

Open Grid Europe GmbHSpeicher Haiming 3-Haidach Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
1.38 MSm³/d9.98 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHHaiming 2 7F Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
1.04 MSm³/d7.52 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHSpeicher Haiming 3-Haidach Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 02 Oct 2026
1.38 MSm³/d9.98 MSm³/d

Rest-of-day capacity offer reduced / auction suspended bFZK

Open Grid Europe GmbHHaiming 2 7F Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 02 Oct 2026
1.04 MSm³/d7.52 MSm³/d

Rest-of-day capacity offer reduced / auction suspended bFZK

Open Grid Europe GmbHSpeicher Breitbrunn Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 02 Oct 2026
2.77 MSm³/d20.09 MSm³/d

Day-Ahead capacity offer reduced / auction suspended (bFZK)

Open Grid Europe GmbHSpeicher Bierwang Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 02 Oct 2026
2.77 MSm³/d20.09 MSm³/d

Day-Ahead capacity offer reduced / auction suspended (bFZK)

Open Grid Europe GmbHSpeicher Breitbrunn Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
2.77 MSm³/d20.09 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHSpeicher Bierwang Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
2.77 MSm³/d20.09 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHSpeicher Breitbrunn Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 02 Oct 2026
2.77 MSm³/d20.09 MSm³/d

Rest-of-day capacity offer reduced / auction suspended bFZK

Open Grid Europe GmbHSpeicher Bierwang Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 02 Oct 2026
2.77 MSm³/d20.09 MSm³/d

Rest-of-day capacity offer reduced / auction suspended bFZK

Open Grid Europe GmbHVIP THE-ZTP Entry—UnplannedTransmission system unavailability
01 Oct 2026
→ 02 Oct 2026
0.46 MSm³/d56.80 MSm³/d

Rest-of-day capacity offer reduced / auction suspended

Open Grid Europe GmbHVIP THE-ZTP Entry—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
0.46 MSm³/d56.80 MSm³/d

Capacity offer reduced / Suspension in monthly auction

Open Grid Europe GmbHVIP THE-ZTP Entry—UnplannedTransmission system unavailability
01 Oct 2026
→ 02 Oct 2026
0.46 MSm³/d56.80 MSm³/d

Day-ahead capacity offer reduced / auction suspended

Open Grid Europe GmbHVIP Oberkappel Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 02 Oct 2026
2.82 MSm³/d20.46 MSm³/d

Day-ahead capacity offer reduced / auction suspended

Open Grid Europe GmbHVIP Oberkappel Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
2.82 MSm³/d10.96 MSm³/d

Capacity offer reduced / Suspension in monthly auction

Open Grid Europe GmbHVIP Oberkappel Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 02 Oct 2026
2.82 MSm³/d20.46 MSm³/d

Rest-of-day capacity offer reduced / auction suspended

Open Grid Europe GmbHDornum Entry—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
10.41 MSm³/d28.29 MSm³/d

Capacity offer reduced / Suspension in monthly auction

Open Grid Europe GmbHEmden EPT Entry—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
1.14 MSm³/d23.56 MSm³/d

Capacity offer reduced / Suspension in monthly auction

Open Grid Europe GmbHZone MND ESG Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
1.22 MSm³/d3.12 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHZone MND ESG Entry—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
0.30 MSm³/d0.89 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHDornum Entry—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
8.58 MSm³/d28.29 MSm³/d

Capacity offer reduced / Suspension in monthly auction

Open Grid Europe GmbHEmden EPT Entry—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
1.14 MSm³/d23.56 MSm³/d

Capacity offer reduced / Suspension in monthly auction

Open Grid Europe GmbHSpeicher Haiming 3-Haidach Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
3.69 MSm³/d8.60 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHHaiming 2 7F Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
2.78 MSm³/d6.48 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHSpeicher Bierwang Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
7.43 MSm³/d17.32 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHSpeicher Breitbrunn Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
7.43 MSm³/d17.32 MSm³/d

Capacity offer reduced / Suspenstion in monthly auction bFZK

Open Grid Europe GmbHVIP Oberkappel Exit—UnplannedTransmission system unavailability
01 Oct 2026
→ 01 Nov 2026
9.49 MSm³/d10.96 MSm³/d

Capacity offer reduced / Suspension in monthly auction

Fluxys Belgium———
01 Oct 2026
→ 02 Oct 2026
——

Brussels, 30.09.2026 - 17:20. Fluxys BELGIUM has activated overnomination at IP VIP THE-ZTP-Exit. Overnomination is now possible for this IP for transport period 01.10.2026 - 06:00 - end of gas day.

Fluxys Belgium———
01 Oct 2026
→ 02 Oct 2026
——

Brussels, 30.09.2026 - 17:20. Fluxys BELGIUM has activated overnomination at IP Virtualys-Entry. Overnomination is now possible for this IP for transport period 01.10.2026 - 06:00 - end of gas day.

FGSZ———
01 Oct 2026
→ —
——

Effective from 01.10.2026, capacities at the VIP Bereg HU>UA (EIC 21Z000000000507L) cross-border IP will be offered as bundled product.The first bundled capacity auction offered will be the auction for October 2026 monthly product, starting on 21.09.2026.Please note that, due to the nature of bundled capacity products, the network usage requirements must be fulfilled on both TSO sides of the IP. For details on the regulatory requirements on the Ukrainian side, please contact GTSOU LLC.

Thyssengas GmbH———
30 Sept 2026
→ 02 Oct 2026
——

From 1 January 2027 the biogas levy at all exit points NAP/NKP is 1.6164 €/kWh/h/y and the market area conversion levy at all exit points NAP/NKP is 0.6133 €/kWh/h/y.

BBL CompanyBBL CompanyExitPlannedTransmission system unavailability
30 Sept 2026
→ 15 Oct 2026
0.95 MSm³/d0.95 MSm³/d

BBL’s annual planned maintenance period will take place during 15 gas days starting from Wednesday 30 September 2026 at 06:00 CEST. Activities will be resumed on Thursday 15 October 2026 at 06:00 CEST. During this maintenance period, no gas flows will be possible. If you have any further questions, please contact our Commercial Operations team at commercial_operations@bblcompany.com.

BBL CompanyBBL CompanyEntryPlannedTransmission system unavailability
30 Sept 2026
→ 15 Oct 2026
0.73 MSm³/d0.73 MSm³/d

BBL’s annual planned maintenance period will take place during 15 gas days starting from Wednesday 30 September 2026 at 06:00 CEST. Activities will be resumed on Thursday 15 October 2026 at 06:00 CEST. During this maintenance period, no gas flows will be possible. If you have any further questions, please contact our Commercial Operations team at commercial_operations@bblcompany.com.

GASCADE Gastransport GmbH———
29 Sept 2026
→ 02 Oct 2026
——

Maintenance works for GASCADE Gastransport GmbH: Cancellation of ID 2026-038. The updated overview can be found under the following link: https://tron.gascade.biz/

Snam Rete Gas SpA35718301 - Tarvisio - Entry Poin—PlannedTransmission system unavailability
28 Sept 2026
→ 03 Oct 2026
52.44 MSm³/d234.11 MSm³/d

PIPELINE MAINTENANCE WORKS AT PDC 35718301 WILL TAKE PLACE FROM GAS DAY 28/09/2026 TO GAS DAY 02/10/2026. THE CAPACITY WILL BE RESTRICT OF 22.4 % OF THE TECHNICAL CAPACITY.

Gasunie Deutschland Transport Services GmbHVIP DK-THEEntryPlannedOther unavailability
28 Sept 2026
→ 02 Oct 2026
0.02 MSm³/d0.13 MSm³/d

Due to technical measures, FZK capacity is reduced.

Hellenic Gas Transmission System Operator S.A.AGIA TRIADAEntryPlannedRegasification plant unavailability
27 Sept 2026
→ 02 Oct 2026
10.86 MSm³/d21.42 MSm³/d

LNG Injection Rate: 0 m3 LNG/hourGasification Capacity of LNG Facility: 110,702,664 kWh/DayTransmission Capacity for Delivery at Entry Point 'AGIA TRIADA': 110,702,664 kWh/Day

Gasgrid Finland Oy———
25 Sept 2026
→ —
——

The total Technical Capacity of Balticconnector is shared between the Technical Capacity allocated for bilateral trading and the Technical Capacity allocated for the gas exchange. Given the low utilisation of the capacity allocated for bilateral trading, Gasgrid Finland and Elering will adjust the allocation shares for the Estonia-to-Finland direction from gas day 25 September 2026 to align the allocation of Technical Capacity with observed market conditions: 80% of the Technical Capacity will be allocated to bilateral trading and 20% to the gas exchange. The new allocation will take effect in the day-ahead ICA session opening on 24 September 2026 at 10:00 EEST for gas day 25 September 2026. The current 90%/10% allocation ratio will be reinstated should demand for Technical Capacity allocated for bilateral trading increases.

Hellenic Gas Transmission System Operator S.A.REVYTHOUSSA LNG TERMINALExitPlannedRegasification plant unavailability
24 Sept 2026
→ 09 Oct 2026
0.00 MSm³/d21.42 MSm³/d

LNG Injection Rate: 0 m3 LNG/hour.

Gasunie Deutschland Transport Services GmbH———
21 Sept 2026
→ 03 Oct 2026
——

Due to maintenance work, the FZK capacity at the network point VIP TTF-THE-H Entry (H647). For further information, please have a look at our transparency platform (https://tron-gud.publication.virtimo.cloud/?language=en#).

GASCADE Gastransport GmbH———
16 Sept 2026
→ 02 Oct 2026
——

Maintenance works for GASCADE Gastransport GmbH. New ID 2026-038. The updated overview can be found under the following link: https://tron.gascade.biz/

GASCADE Gastransport GmbH———
11 Sept 2026
→ 30 Sept 2027
——

Maintenance works for GASCADE Gastransport GmbH: New start and end date for ID 2026-030. The updated overview can be found under the following link: https://tron.gascade.biz/

GASCADE Gastransport GmbH———
11 Sept 2026
→ 20 Aug 2027
——

Maintenance works for GASCADE Gastransport GmbH: Cancellation of ID 2026-032. The updated overview can be found under the following link: https://tron.gascade.biz/

NET4GAS———
07 Sept 2026
→ 01 Jan 2027
——

Due to changes in the operation of the gas transmission system, NET4GAS will adjust the technical capacity at MND Gas Storage (EIC: 21Z000000000452K) and MND Energy Storage (EIC: 27ZG007-009Q001S), for both entry and exit directions, as of September 7, 2026.

GASCADE Gastransport GmbH———
26 Aug 2026
→ 02 Jul 2027
——

Maintenance works for GASCADE Gastransport GmbH: Later start and end date for ID 2026-031. The updated overview can be found under the following link: https://tron.gascade.biz/

ONTRAS Gastransport GmbH———
25 Aug 2026
→ 01 Jan 2027
——

ONTRAS Gastransport GmbH, with a reference to UMM ID 26052821X-DE-F-A0A0A-2001, informs that VIP THE-PL capacities will be marketed via GSA Platform. The first auction will be the monthly auction for January 2027 on 21 December 2026. Registration for ONTRAS on GSA Platform opens on 1 September 2026. The contracted capacity at Mallnow and GCP GAZ-SYSTEM/ONTRAS interconnection points will be transferred to the VIP THE-PL as of 1st January 2027, 06:00 a.m.

GASCADE Gastransport GmbH———
25 Aug 2026
→ 01 Jan 2027
——

GASCADE Gastransport GmbH, with a reference to UMM ID 26052821X-DE-H-A0A0A-L001, informs that VIP THE-PL capacities will be marketed via GSA Platform. The first auction will be the monthly auction for January 2027 on 21 December 2026. Registration for ONTRAS Gastransport GmbH on GSA Platform opens on 1 September 2026. . The contracted capacity at Mallnow and GCP GAZ-SYSTEM/ONTRAS interconnection points will be transferred to the VIP THE-PL as of 1st January 2027, 06:00 a.m.

NaTran———
12 Aug 2026
→ 01 Nov 2026
——

Due to Technical Issue at Roussines Station, Limits are impacted as following: SN0/SN1 : 130GWh NS3/EO2/NS4/S1: 150GWh Remarks: Increase of the risk of call for tenders on the locational product on these limits during the period

NaTran DeutschlandVIP France - GermanyExitUnplannedTransmission system unavailability
01 Aug 2026
→ 01 Nov 2026
953.74 MSm³/d953.74 MSm³/d

Due to the current transport situation or maintenance, the monthly auction regarding the mentioned entry/exit points will take place with a reduced capacity offer or will be suspended.

Plinovodi d.o.o.———
31 Jul 2026
→ 01 Nov 2026
——

Capacity increase on IP Rogatec (HR>SLO) With the commissioning of Plinacro’s Zabok – Lučko pipeline, the technical capacity of Rogatec IP (EIC: 21Z000000000128T) in the HR>SLO direction increased from 30,000 m3/h (15°C) to 100,000 m3/h (15°). From July 2026, the increased capacity is available as interruptible capacity during trial operation; after the use permit is issued, the full capacity will be offered as firm capacity. Further information is available on Plinovodi’s web page.

FGSZ———
30 Jul 2026
→ 31 Dec 2026
——

With the future commissioning of Plinacro’s Bosiljevo–Sisak and Kozarac–Sisak pipelines, the technical capacity of Drávaszerdahely IP (EIC: 21Z000000000249H) in the HR>HU direction will increase from 200,000 to 400,000 m³/h. From 31 December 2026, the additional 200,000 m³/h will be available as interruptible capacity during trial operation; after the final use permit is issued, the full capacity will be offered as firm capacity.

bayernets———
23 Jun 2026
→ 31 Dec 2027
——

Im Preisblatt der bayernets für die Entgeltperiode 2027 wurden die Preise und Abschläge für die Punkte USP Haidach Entry, USP Haidach Exit, Haiming2-7F/bn Exit und Haiming 2-RAGES/bn teilweise angepasst. The prices and discounts for the points USP Haidach Entry, USP Haidach Exit, Haiming2-7F/bn Exit and Haiming 2-RAGES/bn in the price list of bayernets for the 2027 tariff period have been partially adjusted.

GASCADE Gastransport GmbH———
01 Jun 2026
→ 01 Jan 2027
——

GASCADE Gastransport GmbH informs that a new Virtual Interconnection Point (VIP) “VIP THE-PL” between the German market area (Trading Hub Europe – THE) and the Polish entry-exit system (comprising the Polish national transmission system and the TGPS transit pipeline system) will be established effective 1 January 2027, 06:00 CET. The VIP will be created by merging the existing interconnection points Mallnow and GCP GAZ-SYSTEM/ONTRAS. ONTRAS Gastransport GmbH will market capacities on the German side of the VIP. All capacities contracted with GASCADE at Mallnow up to this date will be transferred to VIP THE-PL as of 1 January 2027, 06:00 CET.

GASCADE Gastransport GmbH———
01 Jun 2026
→ 01 Jan 2028
——

The fees for firm and free assignable capacity with a booking period of one year amount to 7,31 €/kWh/h/a for the TRADING HUB EUROPE market area with effect from 01.01.2027.

ONTRAS Gastransport GmbH———
28 May 2026
→ 01 Jan 2027
——

"ONTRAS Gastransport GmbH informs that a new Virtual Interconnection Point (VIP) “VIP THE-PL” between the German market area (Trading Hub Europe – THE) and the Polish entry-exit system (comprising the Polish national transmission system and the TGPS transit pipeline system) will be established effective 1 January 2027, 06:00 CET. The VIP will be created by merging the existing interconnection points Mallnow and GCP GAZ-SYSTEM/ONTRAS. ONTRAS Gastransport GmbH will market capacities on the German side of the VIP. All capacities contracted with ONTRAS at GCP GAZ-SYSTEM/ONTRAS up to this date will be transferred to VIP THE-PL as of 1 January 2027, 06:00 CET."

NaTran———
22 May 2026
→ 01 Jan 2028
——

To preserve network safety, constraints are applied on the network operations. The limits are therefore reduced as follows: -SN1/SN0: 70 GWh -SN3/SN4: 30 GWh -NS3/EO2/NS4/S1: 10 GWh

Conexus Baltic Grid JSC———
01 May 2026
→ 01 May 2027
——

IUGS technical capacity for 2026./2027. years cycle is 24 405 300 000 kWh

GASCADE Gastransport GmbH———
21 Apr 2026
→ 09 Oct 2026
——

Maintenance works for GASCADE Gastransport GmbH: Cancellation of IDs 2026-009 and 2026-010. The updated overview can be found under the following link: https://tron.gascade.biz/

terranets bw GmbH———
01 Jan 2026
→ 01 Jan 2027
——

The network fees for firm freely allocable capacities with a term of one gas year are 7,06 €/(kWh/h)/a in the Trading Hub Europe GmbH market area, valid from 1 January 2026 until 1 January 2027. The fees result from the BNetzA decision BK9-23/610 (REGENT 2026).

Open Grid Europe GmbH———
01 Jan 2026
→ 01 Jan 2027
——

OGE publishes network fees for 2026 (MA THE) - The network fees for firm freely allocable capacities with a term of one gas year are 7.06 €/(kWh/h)/a in the Trading Hub Europe GmbH market area, valid from 1 January 2026 until 1 January 2027.

Gasunie Deutschland Transport Services GmbH———
01 Jan 2026
→ 01 Jan 2027
——

GUD publishes network fees for 2026 (MA THE)The network fees for firm freely allocable capacities with a term of one gas year are 7.06 €/(kWh/h)/a in the Trading Hub Europe GmbH market area, valid from 1 January 2026 until 1 January 2027.The fees result from the BNetzA decision BK9-23/610 (REGENT 2026).

NaTran DeutschlandVIP France GermanyEntryUnplannedTransmission system unavailability
01 Jan 2026
→ 01 Jan 2027
0.00 MSm³/d0.00 MSm³/d

Die Entgelte ergeben sich gemäß der Festlegung der BNetzA BK9-23/610 (REGENT 2026).The fees result from the BNetzA decision BK9-23/610 (REGENT 2026).

NaTran DeutschlandVIP France GermanyExitUnplannedTransmission system unavailability
01 Jan 2026
→ 01 Jan 2027
0.00 MSm³/d0.00 MSm³/d

Die Entgelte ergeben sich gemäß der Festlegung der BNetzA BK9-23/610 (REGENT 2026).The fees result from the BNetzA decision BK9-23/610 (REGENT 2026).

GASCADE Gastransport GmbH———
01 Jan 2026
→ 01 Jan 2027
——

Die Netzentgelte für eine feste frei zuordenbare Kapazität mit einer Laufzeit von einem Jahr belaufen sich für das Marktgebiet TRADING HUB EUROPE auf 7,06 €/kWh/h/a mit Wirkung ab dem 01.01.2026.The fees for firm and free assignable capacity with a booking period of one year amount to 7,06 €/kWh/h/a for the TRADING HUB EUROPE market area with effect from 01.01.2026.

NEL Gastransport GmbH———
01 Jan 2026
→ 01 Jan 2027
——

Die Netzentgelte für eine feste frei zuordenbare Kapazität mit einer Laufzeit von einem Jahr belaufen sich für das Marktgebiet TRADING HUB EUROPE auf 7,06 €/kWh/h/a mit Wirkung ab dem 01.01.2026.The fees for firm and free assignable capacity with a booking period of one year amount to 7,06 €/kWh/h/a for the TRADING HUB EUROPE market area with effect from 01.01.2026.

Open Grid Europe GmbH———
01 Jan 2026
→ 01 Jan 2027
——

OGE publishes biogas levy 2026 - The German-wide levy 2026 according to Cooperation Agreement is for biogas 1.3268 €/(kWh/h)/a.

Open Grid Europe GmbH———
01 Jan 2026
→ 01 Jan 2027
——

OGE publishes market area conversion levy 2026 - The German-wide levy 2026 according to Cooperation Agreement is for market area conversion 0.7189 €/(kWh/h)/a.

NET4GAS———
01 Jan 2026
→ 01 Jan 2027
——

An initial outage plan for year 2026 has been published

NaTranPS000SAExitUnplannedTransmission system unavailability
28 Nov 2025
→ 31 Dec 2026
0.48 MSm³/d0.74 MSm³/d

From the GD of 28/11/2025, a reduction of the exit capacity for PITS Sud Est might be applied. This reduction could reach a maximum of 5 GWh/d.

Fluxys TENP GmbH———
31 Oct 2025
→ 31 Dec 2099
——

Düsseldorf, 31.10.2025 – 14:15 Fluxys TENP has activated the function to transfer nomination rights from an already existing "Transfer of Use"-deal to a further third party by means of a second "Transfer of Use"-deal on PRISMA. All involved parties must be registered with Fluxys TENP on PRISMA. Please contact us at "dispatching.fluxystenp@fluxys.com" in case of any question you may have. Düsseldorf, 31.10.2025 – 14:15 Fluxys TENP hat auf PRISMA die Möglichkeit aktiviert, Nominierungsrechte aus einem bereits bestehenden Übertragungsvertrag ("Transfer of Use") durch einen zweiten Übertragungsvertrag auf eine dritte Partei zu übertragen. Alle involvierten Parteien müssen dafür bei Fluxys TENP auf PRISMA registriert sein. Bei Fragen kontaktieren Sie uns gerne unter "dispatching.fluxystenp@fluxys.com".

NaTranSPNS2UEntryUnplannedCompressor station unavailability
02 May 2025
→ 01 Jan 2027
0.00 MSm³/d95.13 MSm³/d

Increase of the risk of call for tenders on the locational product on these limits during this period

Conexus Baltic Grid JSC———
01 Jan 2025
→ 01 Jan 2035
——

Default long-term injection and withdrawal capacities for Inčukalns UGS have been updated

GASCADE Gastransport GmbH———
23 Dec 2024
→ 01 Jan 2027
——

As of 23.12.2024 06:00 CET Fluxys Deutschland GmbH (Fluxys) and GASCADE Gastransport GmbH (GASCADE) will offer additional 4,000,000 kWh/h dynamically allocable capacity (DZK) at the LNG Entry point Baltic Energy Gate (EIC 37Z000000008921D), operated by Fluxys and GASCADE, with allocation restriction to Exit Mallnow (EIC 21Z000000000056S) and Exit VIP Brandov (EIC 21Z0000000004863). Fluxys will offer 25% of the additional capacity, GASCADE 75%. You can find all capacity information in the transparency section Fluxys’ and GASCADEs' websites.

Fluxys Deutschland GmbH———
23 Dec 2024
→ 01 Jan 2027
——

As of 23.12.2024 06:00 CET Fluxys Deutschland GmbH (Fluxys) and GASCADE Gastransport GmbH (GASCADE) will offer additional 4,000,000 kWh/h dynamically allocable capacity (DZK) at the LNG Entry point Baltic Energy Gate (EIC 37Z000000008921D) Entry, operated by Fluxys and GASCADE, with allocation restriction to Exit Mallnow (EIC 21Z000000000056S) and Exit VIP Brandov (EIC 21Z0000000004863). Fluxys will offer 25% of the additional capacity, GASCADE 75%. You can find all capacity information in the transparency section Fluxys’ and GASCADE’s websites.

terranets bw GmbHRC BaselExitPlannedOther unavailability
01 Oct 2024
→ 01 Oct 2030
0.01 MSm³/d0.04 MSm³/d

terranets bw will reduce the exit capacity at IP Basel beginning from October 1st 2024 permanently by 102222 kWh/h. The reason for this is a national obligation by the NRA to reallocate capacities for upcoming auctions.

GASCADE Gastransport GmbH———
01 Oct 2024
→ 01 Oct 2029
——

GASCADE will change the technical capacities for the network points Mallnow and VIP Brandov starting from 01 October 2024 06:00 a.m. (CET) which will be the basis for the capacity offer at those points in the Annual Yearly Auction 2024.For further information please refer to the publication on GASCADE’s transparency platform (https://tron.gascade.biz/?language=en) as well as on the ENTSOG TP.

GASCADE Gastransport GmbH———
01 Oct 2024
→ 01 Oct 2029
——

In the Annual Yearly Auction 2024, GASCADE will offer technical capacities for the network point Greifswald (former Greifswald OPAL point) starting from 01 October 2024 06:00 a.m. (CET).

Elering ASVärska EntryEntryPlannedTransmission system unavailability
30 Dec 2022
→ 31 Dec 2029
4.01 MSm³/d4.01 MSm³/d

Not new UMM, original from https://umm.getbaltic.com/public-umm/3470

Elering AS———
23 Sept 2022
→ 27 Apr 2031
——

The technical maximum capacity of the Paldiski LNG entry point will be between 90 GWh and 120GWh during normal operation. The normal operating capacity is dependent on the Finnish and Estonian consumption levels and Latvian network regimes. This is not new UMM, original https://umm.getbaltic.com/public-umm/3128

Open Grid Europe———
01 Oct 2021
→ 01 Jan 2030
——

Reduction of firm capacities for yearly auction (01.07.2019): OGE will not offer any firm freely allocable capacities at entry points (Entry-FZK) within the H-Gas market area in the yearly auction from 01.10.2021 onwards. Only interruptible capacities at entry points will be offered for a period of five years.

Open Grid Europe———
01 Oct 2021
→ 01 Jan 2030
——

Reduction of capacities for yearly auction (01.07.2019): Open Grid Europe will not offer any conditionally firm freely allocable capacities at entry points (Entry-bFZK) at Virtual Interconnection Points. This limitation refers to capacities within the H-Gas market area for the period starting on 01.10.2021.

Subscribe to Access

Get full access to real-time European gas flow data, LNG terminals, market prices and more.

View Plans & Start Free Trial

7-day free trial · No credit card required upfront

Data is collected on a daily basis from open resources such as ENTSOG, GIE (AGSI, ALSI) and the websites of TSOs.