Supply Statistics
Data for 2026.09.30
Latest Gas Prices
LiveLast record: 01.10.2026 14:00:00
Gas Balance — Bulgaria
Data for 2026.09.30 · Values in Sm³/day
Main Entrances into Europe — Hourly
Physical flow per hour at the main import entry points (ENTSOG Transparency Platform)
UGS Storage Statistics
Current volume vs. 1 year ago by country (GSm³)
Latest data: 2026-09-29 · vs. 2025-09-29 (1 year prior)
Gas Receiving Points Map
Showing Gas Receiving Points with known coordinates
AIS LNG Tanker Tracker
Live tanker positions in European waters (aisstream.io)
CEE Gas & LNG News
Latest gas & LNG stories from ceenergynews.com & oilprice.com & t.me/papagaz
- Газ-Батюшка5h ago📈 В России с сегодняшнего дня выросла оптовая цена на газt.me/papagaz
📰 С 1 октября 2026 года оптовые цены на газ для всех потребителей, включая население, повышены на 9,6%. ℹ️ Это уже второе повышение тарифов за 2026 год. С 1 января они индексировались на 1,7% в связи с повышением ставки НДС. Изначально основную индексацию планировали провести с
- Oil & Gas9h agoRussian-Serbian gas agreement extendedceenergynews.com
Russia supplies around 75 per cent of Serbia's annual gas demand at a "preferential price".
- LNG11h agoPakistan Weighs Direct LNG Imports for Power Plants to Ease Energy Crisisoilprice.com
Pakistan’s government is considering allowing power plants and private firms to directly import LNG procured on the spot market as the country has been struggling with an energy crisis since the Iran war crippled Qatar’s term supplies. Paki
Unavailabilities of Gas Facilities
Active Urgent Market Messages from ENTSOG Transparency Platform
154 active unavailability message(s) · Source: ENTSOG Transparency Platform
| Operator | Point / Asset | Dir. | Type | Event | Period | Unavailable | Technical | Remarks |
|---|---|---|---|---|---|---|---|---|
| Conexus Baltic Grid JSC | — | — | — | 15 Oct 2026 → 01 May 2027 | — | — | Inčukalns UGS withdrawal capacity has been reviewed for the 2026/2027 withdrawal season and remained unchanged for the 2026/2027 injectionl season. | |
| AB Amber Grid | Klaipeda LNG Terminal FSRU Independence | Entry | Planned | Transmission system unavailability | 15 Oct 2026 → 23 Oct 2026 | 7.23 MSm³/d | 11.13 MSm³/d | Maintenance works. |
| Plinovodi d.o.o. | Šempeter | Entry | Planned | Transmission system unavailability | 15 Oct 2026 → 19 Oct 2026 | 3.74 MSm³/d | 3.74 MSm³/d | Due to maintenance work on the M3 gas pipeline (KPA - MMRP Šempeter), the available entry and exit transmission capacity via the interconnection point Šempeter will be reduced to 0 kWh/h in the entry and exit directions during the specified period. |
| Plinovodi d.o.o. | Šempeter | Exit | Planned | Transmission system unavailability | 15 Oct 2026 → 19 Oct 2026 | 2.48 MSm³/d | 2.48 MSm³/d | Due to maintenance work on the M3 gas pipeline (KPA - MMRP Šempeter), the available entry and exit transmission capacity via the interconnection point Šempeter will be reduced to 0 kWh/h in the entry and exit directions during the specified period. |
| Open Grid Europe GmbH | VIP Oberkappel Entry | — | Unplanned | Transmission system unavailability | 15 Oct 2026 → 16 Oct 2026 | 6.74 MSm³/d | 6.74 MSm³/d | Rest-of-day capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | VIP Oberkappel Entry | — | Unplanned | Transmission system unavailability | 15 Oct 2026 → 16 Oct 2026 | 4.10 MSm³/d | 4.10 MSm³/d | Rest-of-day capacity offer reduced / auction suspended bFZK |
| Open Grid Europe GmbH | VIP Oberkappel Entry | — | Unplanned | Transmission system unavailability | 15 Oct 2026 → 16 Oct 2026 | 6.74 MSm³/d | 6.74 MSm³/d | Day-ahead capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | VIP Oberkappel Entry | — | Unplanned | Transmission system unavailability | 15 Oct 2026 → 16 Oct 2026 | 4.10 MSm³/d | 4.10 MSm³/d | Day-Ahead capacity offer reduced / auction suspended (bFZK) |
| Open Grid Europe GmbH | VIP Oberkappel Exit | — | Unplanned | Transmission system unavailability | 15 Oct 2026 → 16 Oct 2026 | 9.49 MSm³/d | 20.46 MSm³/d | Day-ahead capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | VIP Oberkappel Exit | — | Unplanned | Transmission system unavailability | 15 Oct 2026 → 16 Oct 2026 | 9.49 MSm³/d | 20.46 MSm³/d | Rest-of-day capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | VIP Oberkappel Entry | — | Unplanned | Transmission system unavailability | 13 Oct 2026 → 15 Oct 2026 | 6.74 MSm³/d | 6.74 MSm³/d | Rest-of-day capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | VIP Oberkappel Entry | — | Unplanned | Transmission system unavailability | 13 Oct 2026 → 15 Oct 2026 | 6.74 MSm³/d | 6.74 MSm³/d | Day-ahead capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | VIP Oberkappel Entry | — | Unplanned | Transmission system unavailability | 13 Oct 2026 → 15 Oct 2026 | 4.10 MSm³/d | 4.10 MSm³/d | Day-Ahead capacity offer reduced / auction suspended (bFZK) |
| Open Grid Europe GmbH | VIP Oberkappel Entry | — | Unplanned | Transmission system unavailability | 13 Oct 2026 → 15 Oct 2026 | 4.10 MSm³/d | 4.10 MSm³/d | Rest-of-day capacity offer reduced / auction suspended bFZK |
| Open Grid Europe GmbH | VIP Oberkappel Exit | — | Unplanned | Transmission system unavailability | 13 Oct 2026 → 15 Oct 2026 | 9.49 MSm³/d | 20.46 MSm³/d | Day-ahead capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | VIP Oberkappel Exit | — | Unplanned | Transmission system unavailability | 13 Oct 2026 → 15 Oct 2026 | 9.49 MSm³/d | 20.46 MSm³/d | Rest-of-day capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | VIP Oberkappel Exit | — | Planned | Transmission system unavailability | 13 Oct 2026 → 15 Oct 2026 | 10.96 MSm³/d | 10.96 MSm³/d | Maintenance with notification period shorter than required under Annex I, point 3.3.1 g) of Regulation (EU) 2024/1789 |
| Open Grid Europe GmbH | VIP Oberkappel Entry | — | Planned | Transmission system unavailability | 13 Oct 2026 → 15 Oct 2026 | 0.00 MSm³/d | 0.00 MSm³/d | Maintenance with notification period shorter than required under Annex I, point 3.3.1 g) of Regulation (EU) 2024/1789 |
| Hellenic Gas Transmission System Operator S.A. | SIDIROKASTRO | Exit | Planned | Compressor station unavailability | 13 Oct 2026 → 15 Oct 2026 | 5.27 MSm³/d | 8.89 MSm³/d | Transmission Capacity for Reception of Reverse Flow at Exit Point 'SIDIROKASTRO': 38,000,000 kWh/Day. |
| terranets bw GmbH | — | — | — | 12 Oct 2026 → 12 Oct 2026 | — | — | Due to internal system upgrades, there will be an outage in market communications on October 12, 2026, from 11:00 a.m. to 1:00 p.m. Incoming and outgoing messages will be confirmed and sent once the system upgrade is complete. | |
| Hellenic Gas Transmission System Operator S.A. | SIDIROKASTRO | Entry | Planned | Compressor station unavailability | 12 Oct 2026 → 15 Oct 2026 | 8.39 MSm³/d | 11.44 MSm³/d | '- |
| Hellenic Gas Transmission System Operator S.A. | NEA MESIMVRIA | Entry | Planned | Compressor station unavailability | 12 Oct 2026 → 15 Oct 2026 | 3.01 MSm³/d | 4.25 MSm³/d | '- |
| Hellenic Gas Transmission System Operator S.A. | AMFITRITI | Entry | Planned | Compressor station unavailability | 12 Oct 2026 → 15 Oct 2026 | 4.53 MSm³/d | 4.53 MSm³/d | Transmission Capacity for Delivery at Entry Point 'AMFITRITI' to VTP: 0 kWh/Day. |
| Hellenic Gas Transmission System Operator S.A. | SIDIROKASTRO | Exit | Planned | Compressor station unavailability | 12 Oct 2026 → 13 Oct 2026 | 8.89 MSm³/d | 8.89 MSm³/d | Transmission Capacity for Reception of Reverse Flow at Exit Point 'SIDIROKASTRO': 0 kWh/Day. |
| Open Grid Europe GmbH | Wilhelmshaven, LNG-Zone Entry | — | Unplanned | Transmission system unavailability | 11 Oct 2026 → 24 Oct 2026 | 14.88 MSm³/d | 27.93 MSm³/d | FCFS capacity offer reduced / suspended |
| Open Grid Europe GmbH | Dornum Entry | — | Unplanned | Transmission system unavailability | 09 Oct 2026 → 11 Oct 2026 | 8.58 MSm³/d | 39.73 MSm³/d | Rest-of-day capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | Emden EPT Entry | — | Unplanned | Transmission system unavailability | 09 Oct 2026 → 11 Oct 2026 | 1.14 MSm³/d | 24.70 MSm³/d | Rest-of-day capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | Wilhelmshaven, LNG-Zone Entry | — | Unplanned | Transmission system unavailability | 09 Oct 2026 → 11 Oct 2026 | 2.86 MSm³/d | 27.93 MSm³/d | FCFS capacity offer reduced / suspended |
| Open Grid Europe GmbH | Dornum Entry | — | Unplanned | Transmission system unavailability | 09 Oct 2026 → 11 Oct 2026 | 8.58 MSm³/d | 39.73 MSm³/d | Day-ahead capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | Emden EPT Entry | — | Unplanned | Transmission system unavailability | 09 Oct 2026 → 11 Oct 2026 | 1.14 MSm³/d | 24.70 MSm³/d | Day-ahead capacity offer reduced / auction suspended |
| Plinovodi d.o.o. | Šempeter | Entry | Planned | Transmission system unavailability | 08 Oct 2026 → 12 Oct 2026 | 3.74 MSm³/d | 3.74 MSm³/d | Due to maintenance work on the M3 gas pipeline (KPA - MMRP Šempeter), the available entry and exit transmission capacity via the interconnection point Šempeter will be reduced to 0 kWh/h in the entry and exit directions during the specified period. |
| Plinovodi d.o.o. | Šempeter | Exit | Planned | Transmission system unavailability | 08 Oct 2026 → 12 Oct 2026 | 2.48 MSm³/d | 2.48 MSm³/d | Due to maintenance work on the M3 gas pipeline (KPA - MMRP Šempeter), the available entry and exit transmission capacity via the interconnection point Šempeter will be reduced to 0 kWh/h in the entry and exit directions during the specified period. |
| Snam Rete Gas SpA | 31334701 - Gazzo Veronese VR - Redelivery Poin | — | Unplanned | Transmission system unavailability | 08 Oct 2026 → 08 Oct 2026 | 0.17 MSm³/d | 0.17 MSm³/d | PIPELINE MAINTENANCE WORKS AFFECTING PDR 31334701 WILL TAKE PLACE ON 08/10/2026 . THE CAPACITY WILL NOT BE AVAILABLE. |
| NET4GAS | — | — | — | 06 Oct 2026 → 06 Oct 2026 | — | — | System unavailability due to system update. Full system services inaccessibility in the defined interval (including B2B automated communications). Expected resolution within 2 hours. | |
| bayernets | — | — | — | 05 Oct 2026 → 08 Oct 2026 | — | — | All entry and exit flows are interrupted due to maintenance at Inzenham station. The affected capacity products are FZK, bFZK and Interruptible. If you have any questions, please contact market@bayernets.de. | |
| Open Grid Europe GmbH | Wilhelmshaven, LNG-Zone Entry | — | Unplanned | Transmission system unavailability | 05 Oct 2026 → 09 Oct 2026 | 1.03 MSm³/d | 27.93 MSm³/d | FCFS capacity offer reduced / suspended |
| Open Grid Europe GmbH | Dornum Entry | — | Unplanned | Transmission system unavailability | 05 Oct 2026 → 09 Oct 2026 | 10.41 MSm³/d | 39.73 MSm³/d | Day-ahead capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | Emden EPT Entry | — | Unplanned | Transmission system unavailability | 05 Oct 2026 → 09 Oct 2026 | 1.14 MSm³/d | 24.70 MSm³/d | Day-ahead capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | Dornum Entry | — | Unplanned | Transmission system unavailability | 05 Oct 2026 → 09 Oct 2026 | 10.41 MSm³/d | 39.73 MSm³/d | Rest-of-day capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | Emden EPT Entry | — | Unplanned | Transmission system unavailability | 05 Oct 2026 → 09 Oct 2026 | 1.14 MSm³/d | 24.70 MSm³/d | Rest-of-day capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | Zone MND ESG Exit | — | Unplanned | Transmission system unavailability | 05 Oct 2026 → 17 Oct 2026 | 1.22 MSm³/d | 3.12 MSm³/d | Day-Ahead capacity offer reduced / auction suspended (bFZK) |
| Open Grid Europe GmbH | Zone MND ESG Entry | — | Unplanned | Transmission system unavailability | 05 Oct 2026 → 17 Oct 2026 | 0.30 MSm³/d | 0.89 MSm³/d | Day-Ahead capacity offer reduced / auction suspended (bFZK) |
| Open Grid Europe GmbH | Zone MND ESG Exit | — | Unplanned | Transmission system unavailability | 05 Oct 2026 → 17 Oct 2026 | 1.22 MSm³/d | 3.12 MSm³/d | Rest-of-day capacity offer reduced / auction suspended bFZK |
| Open Grid Europe GmbH | Zone MND ESG Entry | — | Unplanned | Transmission system unavailability | 05 Oct 2026 → 17 Oct 2026 | 0.30 MSm³/d | 0.89 MSm³/d | Rest-of-day capacity offer reduced / auction suspended bFZK |
| Gasunie Deutschland Transport Services GmbH | VIP TTF-THE-H | Entry | Planned | Other unavailability | 05 Oct 2026 → 11 Oct 2026 | 0.10 MSm³/d | 0.20 MSm³/d | Due to Maintenance work there is a reduction of DZK capacity. |
| Gasunie Deutschland Transport Services GmbH | EMDEN - EPT1 | Entry | Unplanned | Other unavailability | 05 Oct 2026 → 06 Oct 2026 | 0.20 MSm³/d | 0.84 MSm³/d | Due to shortterm maintenance work, the capacity is reduced. Marketable capacity is still available. |
| Hellenic Gas Transmission System Operator S.A. | AGIA TRIADA | Entry | Planned | Regasification plant unavailability | 03 Oct 2026 → 05 Oct 2026 | 21.42 MSm³/d | 21.42 MSm³/d | Gasification Capacity of LNG Facility: 0 kWh/Day |
| Hellenic Gas Transmission System Operator S.A. | AGIA TRIADA | Entry | Planned | Regasification plant unavailability | 02 Oct 2026 → 03 Oct 2026 | 19.04 MSm³/d | 21.42 MSm³/d | Gasification Capacity of LNG Facility: 25.000.000 kWh/Day |
| Fluxys Belgium | — | — | — | 02 Oct 2026 → 03 Oct 2026 | — | — | Brussels, 01.10.2026 - 17:20. Fluxys BELGIUM has activated overnomination at IP VIP THE-ZTP-Exit. Overnomination is now possible for this IP for transport period 02.10.2026 - 06:00 - end of gas day. | |
| Fluxys Belgium | — | — | — | 02 Oct 2026 → 03 Oct 2026 | — | — | Brussels, 01.10.2026 - 17:20. Fluxys BELGIUM has activated overnomination at IP Virtualys-Entry. Overnomination is now possible for this IP for transport period 02.10.2026 - 06:00 - end of gas day. | |
| Gastransport Nord GmbH | Zone UGS EWE L-Gas | Entry | Unplanned | Transmission system unavailability | 01 Oct 2026 → 02 Oct 2026 | 0.08 MSm³/d | 0.11 MSm³/d | Please be informed that our network is actual congested. Interruptible contracts (L-gas) must be interrupted several times due to oversupply. |
| GRTgaz Deutschland | VIP France - Germany | Entry | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Oct 2029 | 7.73 MSm³/d | 7.73 MSm³/d | Due to the current transport situation or maintenance, the yearly auction will take place regarding the mentioned entry/exit points with a reduced capacity offer or will be suspended. |
| GASCADE Gastransport GmbH | — | — | — | 01 Oct 2026 → 31 Oct 2026 | — | — | Maintenance works for GASCADE Gastransport GmbH: Cancellation of ID 2025-064. The updated overview can be found under the following link: https://tron.gascade.biz/ | |
| NaTran Deutschland | VIP France - Germany | Entry | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Oct 2029 | 7.73 MSm³/d | 7.73 MSm³/d | Due to the current transport situation or maintenance, the day-ahead auction regarding the mentioned entry/exit points will take place with a reduced capacity offer or will be suspended on the mentioned days. |
| NaTran Deutschland | VIP France - Germany | Entry | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Oct 2029 | 7.73 MSm³/d | 7.73 MSm³/d | Due to the current transport situation or maintenance, the rest-of-day auctions regarding the mentioned entry/exit points will take place with a reduced capacity offer or will be suspended on the mentioned days. |
| NaTran Deutschland | VIP France - Germany | Entry | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Oct 2029 | 7.73 MSm³/d | 7.73 MSm³/d | Due to the current transport situation or maintenance, the monthly auction regarding the mentioned entry/exit points will take place with a reduced capacity offer or will be suspended. |
| Fluxys Belgium SA/NV | VIP THE-ZTP | Exit | Planned | Other unavailability | 01 Oct 2026 → 23 Oct 2026 | 0.76 MSm³/d | 2.67 MSm³/d | Remaining capacity can be increased and duration window can be shortened during the maintenance |
| Fluxys Belgium SA/NV | VIP-BENE | Exit | Planned | Other unavailability | 01 Oct 2026 → 23 Oct 2026 | 1.88 MSm³/d | 2.54 MSm³/d | Remaining capacity can be increased and duration window can be shortened during the maintenance |
| FGSZ | — | — | — | 01 Oct 2026 → 01 Apr 2027 | — | — | FGSZ and GTSOU hereby announce that continuing their pilot project 5,390,871 kWh/h of technical firm capacity at the VIP Bereg (EIC 21Z000000000507L) will be offered in the direction of Hungary-Ukraine as of 1 October 2026 until the end of the gas day of 31 March 2027. For the above period Q, M, DA and within-day capacity products will be offered. The Q auction will run on 3 August 2026. | |
| Gasunie Deutschland Transport Services GmbH | VIP DK-THE | Exit | Planned | Other unavailability | 01 Oct 2026 → 31 Oct 2026 | 0.38 MSm³/d | 0.38 MSm³/d | Due to maintenance work, capacity is reduced. |
| Gasunie Deutschland Transport Services GmbH | UGS LESUM H | Entry | Planned | Other unavailability | 01 Oct 2026 → 31 Oct 2026 | 0.10 MSm³/d | 0.19 MSm³/d | Due to maintenance work, capacity is reduced. |
| Open Grid Europe GmbH | VIP Oberkappel Entry | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 6.74 MSm³/d | 6.74 MSm³/d | Capacity offer reduced / Suspension in monthly auction |
| Open Grid Europe GmbH | VIP Oberkappel Entry | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 4.10 MSm³/d | 4.10 MSm³/d | Capacity offer reduced / Suspenstion in monthly auction bFZK |
| Open Grid Europe GmbH | VIP Oberkappel Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 9.49 MSm³/d | 20.46 MSm³/d | Capacity offer reduced / Suspension in monthly auction |
| Open Grid Europe GmbH | Wilhelmshaven, LNG-Zone Entry | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 02 Oct 2026 | 0.23 MSm³/d | 27.93 MSm³/d | FCFS capacity offer reduced / suspended |
| Open Grid Europe GmbH | Dornum Entry | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 02 Oct 2026 | 11.44 MSm³/d | 39.73 MSm³/d | Day-ahead capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | Emden EPT Entry | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 02 Oct 2026 | 1.14 MSm³/d | 24.70 MSm³/d | Day-ahead capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | Dornum Entry | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 02 Oct 2026 | 11.44 MSm³/d | 39.73 MSm³/d | Rest-of-day capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | Emden EPT Entry | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 02 Oct 2026 | 1.14 MSm³/d | 24.70 MSm³/d | Rest-of-day capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | Dornum Entry | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 11.44 MSm³/d | 39.73 MSm³/d | Capacity offer reduced / Suspension in monthly auction |
| Open Grid Europe GmbH | Emden EPT Entry | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 1.14 MSm³/d | 24.70 MSm³/d | Capacity offer reduced / Suspension in monthly auction |
| Open Grid Europe GmbH | Speicher Haiming 3-Haidach Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 02 Oct 2026 | 1.38 MSm³/d | 9.98 MSm³/d | Day-Ahead capacity offer reduced / auction suspended (bFZK) |
| Open Grid Europe GmbH | Haiming 2 7F Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 02 Oct 2026 | 1.04 MSm³/d | 7.52 MSm³/d | Day-Ahead capacity offer reduced / auction suspended (bFZK) |
| Open Grid Europe GmbH | Speicher Haiming 3-Haidach Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 1.38 MSm³/d | 9.98 MSm³/d | Capacity offer reduced / Suspenstion in monthly auction bFZK |
| Open Grid Europe GmbH | Haiming 2 7F Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 1.04 MSm³/d | 7.52 MSm³/d | Capacity offer reduced / Suspenstion in monthly auction bFZK |
| Open Grid Europe GmbH | Speicher Haiming 3-Haidach Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 02 Oct 2026 | 1.38 MSm³/d | 9.98 MSm³/d | Rest-of-day capacity offer reduced / auction suspended bFZK |
| Open Grid Europe GmbH | Haiming 2 7F Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 02 Oct 2026 | 1.04 MSm³/d | 7.52 MSm³/d | Rest-of-day capacity offer reduced / auction suspended bFZK |
| Open Grid Europe GmbH | Speicher Breitbrunn Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 02 Oct 2026 | 2.77 MSm³/d | 20.09 MSm³/d | Day-Ahead capacity offer reduced / auction suspended (bFZK) |
| Open Grid Europe GmbH | Speicher Bierwang Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 02 Oct 2026 | 2.77 MSm³/d | 20.09 MSm³/d | Day-Ahead capacity offer reduced / auction suspended (bFZK) |
| Open Grid Europe GmbH | Speicher Breitbrunn Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 2.77 MSm³/d | 20.09 MSm³/d | Capacity offer reduced / Suspenstion in monthly auction bFZK |
| Open Grid Europe GmbH | Speicher Bierwang Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 2.77 MSm³/d | 20.09 MSm³/d | Capacity offer reduced / Suspenstion in monthly auction bFZK |
| Open Grid Europe GmbH | Speicher Breitbrunn Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 02 Oct 2026 | 2.77 MSm³/d | 20.09 MSm³/d | Rest-of-day capacity offer reduced / auction suspended bFZK |
| Open Grid Europe GmbH | Speicher Bierwang Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 02 Oct 2026 | 2.77 MSm³/d | 20.09 MSm³/d | Rest-of-day capacity offer reduced / auction suspended bFZK |
| Open Grid Europe GmbH | VIP THE-ZTP Entry | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 02 Oct 2026 | 0.46 MSm³/d | 56.80 MSm³/d | Rest-of-day capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | VIP THE-ZTP Entry | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 0.46 MSm³/d | 56.80 MSm³/d | Capacity offer reduced / Suspension in monthly auction |
| Open Grid Europe GmbH | VIP THE-ZTP Entry | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 02 Oct 2026 | 0.46 MSm³/d | 56.80 MSm³/d | Day-ahead capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | VIP Oberkappel Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 02 Oct 2026 | 2.82 MSm³/d | 20.46 MSm³/d | Day-ahead capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | VIP Oberkappel Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 2.82 MSm³/d | 10.96 MSm³/d | Capacity offer reduced / Suspension in monthly auction |
| Open Grid Europe GmbH | VIP Oberkappel Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 02 Oct 2026 | 2.82 MSm³/d | 20.46 MSm³/d | Rest-of-day capacity offer reduced / auction suspended |
| Open Grid Europe GmbH | Dornum Entry | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 10.41 MSm³/d | 28.29 MSm³/d | Capacity offer reduced / Suspension in monthly auction |
| Open Grid Europe GmbH | Emden EPT Entry | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 1.14 MSm³/d | 23.56 MSm³/d | Capacity offer reduced / Suspension in monthly auction |
| Open Grid Europe GmbH | Zone MND ESG Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 1.22 MSm³/d | 3.12 MSm³/d | Capacity offer reduced / Suspenstion in monthly auction bFZK |
| Open Grid Europe GmbH | Zone MND ESG Entry | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 0.30 MSm³/d | 0.89 MSm³/d | Capacity offer reduced / Suspenstion in monthly auction bFZK |
| Open Grid Europe GmbH | Dornum Entry | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 8.58 MSm³/d | 28.29 MSm³/d | Capacity offer reduced / Suspension in monthly auction |
| Open Grid Europe GmbH | Emden EPT Entry | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 1.14 MSm³/d | 23.56 MSm³/d | Capacity offer reduced / Suspension in monthly auction |
| Open Grid Europe GmbH | Speicher Haiming 3-Haidach Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 3.69 MSm³/d | 8.60 MSm³/d | Capacity offer reduced / Suspenstion in monthly auction bFZK |
| Open Grid Europe GmbH | Haiming 2 7F Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 2.78 MSm³/d | 6.48 MSm³/d | Capacity offer reduced / Suspenstion in monthly auction bFZK |
| Open Grid Europe GmbH | Speicher Bierwang Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 7.43 MSm³/d | 17.32 MSm³/d | Capacity offer reduced / Suspenstion in monthly auction bFZK |
| Open Grid Europe GmbH | Speicher Breitbrunn Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 7.43 MSm³/d | 17.32 MSm³/d | Capacity offer reduced / Suspenstion in monthly auction bFZK |
| Open Grid Europe GmbH | VIP Oberkappel Exit | — | Unplanned | Transmission system unavailability | 01 Oct 2026 → 01 Nov 2026 | 9.49 MSm³/d | 10.96 MSm³/d | Capacity offer reduced / Suspension in monthly auction |
| Fluxys Belgium | — | — | — | 01 Oct 2026 → 02 Oct 2026 | — | — | Brussels, 30.09.2026 - 17:20. Fluxys BELGIUM has activated overnomination at IP VIP THE-ZTP-Exit. Overnomination is now possible for this IP for transport period 01.10.2026 - 06:00 - end of gas day. | |
| Fluxys Belgium | — | — | — | 01 Oct 2026 → 02 Oct 2026 | — | — | Brussels, 30.09.2026 - 17:20. Fluxys BELGIUM has activated overnomination at IP Virtualys-Entry. Overnomination is now possible for this IP for transport period 01.10.2026 - 06:00 - end of gas day. | |
| FGSZ | — | — | — | 01 Oct 2026 → — | — | — | Effective from 01.10.2026, capacities at the VIP Bereg HU>UA (EIC 21Z000000000507L) cross-border IP will be offered as bundled product.The first bundled capacity auction offered will be the auction for October 2026 monthly product, starting on 21.09.2026.Please note that, due to the nature of bundled capacity products, the network usage requirements must be fulfilled on both TSO sides of the IP. For details on the regulatory requirements on the Ukrainian side, please contact GTSOU LLC. | |
| Thyssengas GmbH | — | — | — | 30 Sept 2026 → 02 Oct 2026 | — | — | From 1 January 2027 the biogas levy at all exit points NAP/NKP is 1.6164 €/kWh/h/y and the market area conversion levy at all exit points NAP/NKP is 0.6133 €/kWh/h/y. | |
| BBL Company | BBL Company | Exit | Planned | Transmission system unavailability | 30 Sept 2026 → 15 Oct 2026 | 0.95 MSm³/d | 0.95 MSm³/d | BBL’s annual planned maintenance period will take place during 15 gas days starting from Wednesday 30 September 2026 at 06:00 CEST. Activities will be resumed on Thursday 15 October 2026 at 06:00 CEST. During this maintenance period, no gas flows will be possible. If you have any further questions, please contact our Commercial Operations team at commercial_operations@bblcompany.com. |
| BBL Company | BBL Company | Entry | Planned | Transmission system unavailability | 30 Sept 2026 → 15 Oct 2026 | 0.73 MSm³/d | 0.73 MSm³/d | BBL’s annual planned maintenance period will take place during 15 gas days starting from Wednesday 30 September 2026 at 06:00 CEST. Activities will be resumed on Thursday 15 October 2026 at 06:00 CEST. During this maintenance period, no gas flows will be possible. If you have any further questions, please contact our Commercial Operations team at commercial_operations@bblcompany.com. |
| GASCADE Gastransport GmbH | — | — | — | 29 Sept 2026 → 02 Oct 2026 | — | — | Maintenance works for GASCADE Gastransport GmbH: Cancellation of ID 2026-038. The updated overview can be found under the following link: https://tron.gascade.biz/ | |
| Snam Rete Gas SpA | 35718301 - Tarvisio - Entry Poin | — | Planned | Transmission system unavailability | 28 Sept 2026 → 03 Oct 2026 | 52.44 MSm³/d | 234.11 MSm³/d | PIPELINE MAINTENANCE WORKS AT PDC 35718301 WILL TAKE PLACE FROM GAS DAY 28/09/2026 TO GAS DAY 02/10/2026. THE CAPACITY WILL BE RESTRICT OF 22.4 % OF THE TECHNICAL CAPACITY. |
| Gasunie Deutschland Transport Services GmbH | VIP DK-THE | Entry | Planned | Other unavailability | 28 Sept 2026 → 02 Oct 2026 | 0.02 MSm³/d | 0.13 MSm³/d | Due to technical measures, FZK capacity is reduced. |
| Hellenic Gas Transmission System Operator S.A. | AGIA TRIADA | Entry | Planned | Regasification plant unavailability | 27 Sept 2026 → 02 Oct 2026 | 10.86 MSm³/d | 21.42 MSm³/d | LNG Injection Rate: 0 m3 LNG/hourGasification Capacity of LNG Facility: 110,702,664 kWh/DayTransmission Capacity for Delivery at Entry Point 'AGIA TRIADA': 110,702,664 kWh/Day |
| Gasgrid Finland Oy | — | — | — | 25 Sept 2026 → — | — | — | The total Technical Capacity of Balticconnector is shared between the Technical Capacity allocated for bilateral trading and the Technical Capacity allocated for the gas exchange. Given the low utilisation of the capacity allocated for bilateral trading, Gasgrid Finland and Elering will adjust the allocation shares for the Estonia-to-Finland direction from gas day 25 September 2026 to align the allocation of Technical Capacity with observed market conditions: 80% of the Technical Capacity will be allocated to bilateral trading and 20% to the gas exchange. The new allocation will take effect in the day-ahead ICA session opening on 24 September 2026 at 10:00 EEST for gas day 25 September 2026. The current 90%/10% allocation ratio will be reinstated should demand for Technical Capacity allocated for bilateral trading increases. | |
| Hellenic Gas Transmission System Operator S.A. | REVYTHOUSSA LNG TERMINAL | Exit | Planned | Regasification plant unavailability | 24 Sept 2026 → 09 Oct 2026 | 0.00 MSm³/d | 21.42 MSm³/d | LNG Injection Rate: 0 m3 LNG/hour. |
| Gasunie Deutschland Transport Services GmbH | — | — | — | 21 Sept 2026 → 03 Oct 2026 | — | — | Due to maintenance work, the FZK capacity at the network point VIP TTF-THE-H Entry (H647). For further information, please have a look at our transparency platform (https://tron-gud.publication.virtimo.cloud/?language=en#). | |
| GASCADE Gastransport GmbH | — | — | — | 16 Sept 2026 → 02 Oct 2026 | — | — | Maintenance works for GASCADE Gastransport GmbH. New ID 2026-038. The updated overview can be found under the following link: https://tron.gascade.biz/ | |
| GASCADE Gastransport GmbH | — | — | — | 11 Sept 2026 → 30 Sept 2027 | — | — | Maintenance works for GASCADE Gastransport GmbH: New start and end date for ID 2026-030. The updated overview can be found under the following link: https://tron.gascade.biz/ | |
| GASCADE Gastransport GmbH | — | — | — | 11 Sept 2026 → 20 Aug 2027 | — | — | Maintenance works for GASCADE Gastransport GmbH: Cancellation of ID 2026-032. The updated overview can be found under the following link: https://tron.gascade.biz/ | |
| NET4GAS | — | — | — | 07 Sept 2026 → 01 Jan 2027 | — | — | Due to changes in the operation of the gas transmission system, NET4GAS will adjust the technical capacity at MND Gas Storage (EIC: 21Z000000000452K) and MND Energy Storage (EIC: 27ZG007-009Q001S), for both entry and exit directions, as of September 7, 2026. | |
| GASCADE Gastransport GmbH | — | — | — | 26 Aug 2026 → 02 Jul 2027 | — | — | Maintenance works for GASCADE Gastransport GmbH: Later start and end date for ID 2026-031. The updated overview can be found under the following link: https://tron.gascade.biz/ | |
| ONTRAS Gastransport GmbH | — | — | — | 25 Aug 2026 → 01 Jan 2027 | — | — | ONTRAS Gastransport GmbH, with a reference to UMM ID 26052821X-DE-F-A0A0A-2001, informs that VIP THE-PL capacities will be marketed via GSA Platform. The first auction will be the monthly auction for January 2027 on 21 December 2026. Registration for ONTRAS on GSA Platform opens on 1 September 2026. The contracted capacity at Mallnow and GCP GAZ-SYSTEM/ONTRAS interconnection points will be transferred to the VIP THE-PL as of 1st January 2027, 06:00 a.m. | |
| GASCADE Gastransport GmbH | — | — | — | 25 Aug 2026 → 01 Jan 2027 | — | — | GASCADE Gastransport GmbH, with a reference to UMM ID 26052821X-DE-H-A0A0A-L001, informs that VIP THE-PL capacities will be marketed via GSA Platform. The first auction will be the monthly auction for January 2027 on 21 December 2026. Registration for ONTRAS Gastransport GmbH on GSA Platform opens on 1 September 2026. . The contracted capacity at Mallnow and GCP GAZ-SYSTEM/ONTRAS interconnection points will be transferred to the VIP THE-PL as of 1st January 2027, 06:00 a.m. | |
| NaTran | — | — | — | 12 Aug 2026 → 01 Nov 2026 | — | — | Due to Technical Issue at Roussines Station, Limits are impacted as following: SN0/SN1 : 130GWh NS3/EO2/NS4/S1: 150GWh Remarks: Increase of the risk of call for tenders on the locational product on these limits during the period | |
| NaTran Deutschland | VIP France - Germany | Exit | Unplanned | Transmission system unavailability | 01 Aug 2026 → 01 Nov 2026 | 953.74 MSm³/d | 953.74 MSm³/d | Due to the current transport situation or maintenance, the monthly auction regarding the mentioned entry/exit points will take place with a reduced capacity offer or will be suspended. |
| Plinovodi d.o.o. | — | — | — | 31 Jul 2026 → 01 Nov 2026 | — | — | Capacity increase on IP Rogatec (HR>SLO) With the commissioning of Plinacro’s Zabok – Lučko pipeline, the technical capacity of Rogatec IP (EIC: 21Z000000000128T) in the HR>SLO direction increased from 30,000 m3/h (15°C) to 100,000 m3/h (15°). From July 2026, the increased capacity is available as interruptible capacity during trial operation; after the use permit is issued, the full capacity will be offered as firm capacity. Further information is available on Plinovodi’s web page. | |
| FGSZ | — | — | — | 30 Jul 2026 → 31 Dec 2026 | — | — | With the future commissioning of Plinacro’s Bosiljevo–Sisak and Kozarac–Sisak pipelines, the technical capacity of Drávaszerdahely IP (EIC: 21Z000000000249H) in the HR>HU direction will increase from 200,000 to 400,000 m³/h. From 31 December 2026, the additional 200,000 m³/h will be available as interruptible capacity during trial operation; after the final use permit is issued, the full capacity will be offered as firm capacity. | |
| bayernets | — | — | — | 23 Jun 2026 → 31 Dec 2027 | — | — | Im Preisblatt der bayernets für die Entgeltperiode 2027 wurden die Preise und Abschläge für die Punkte USP Haidach Entry, USP Haidach Exit, Haiming2-7F/bn Exit und Haiming 2-RAGES/bn teilweise angepasst. The prices and discounts for the points USP Haidach Entry, USP Haidach Exit, Haiming2-7F/bn Exit and Haiming 2-RAGES/bn in the price list of bayernets for the 2027 tariff period have been partially adjusted. | |
| GASCADE Gastransport GmbH | — | — | — | 01 Jun 2026 → 01 Jan 2027 | — | — | GASCADE Gastransport GmbH informs that a new Virtual Interconnection Point (VIP) “VIP THE-PL” between the German market area (Trading Hub Europe – THE) and the Polish entry-exit system (comprising the Polish national transmission system and the TGPS transit pipeline system) will be established effective 1 January 2027, 06:00 CET. The VIP will be created by merging the existing interconnection points Mallnow and GCP GAZ-SYSTEM/ONTRAS. ONTRAS Gastransport GmbH will market capacities on the German side of the VIP. All capacities contracted with GASCADE at Mallnow up to this date will be transferred to VIP THE-PL as of 1 January 2027, 06:00 CET. | |
| GASCADE Gastransport GmbH | — | — | — | 01 Jun 2026 → 01 Jan 2028 | — | — | The fees for firm and free assignable capacity with a booking period of one year amount to 7,31 €/kWh/h/a for the TRADING HUB EUROPE market area with effect from 01.01.2027. | |
| ONTRAS Gastransport GmbH | — | — | — | 28 May 2026 → 01 Jan 2027 | — | — | "ONTRAS Gastransport GmbH informs that a new Virtual Interconnection Point (VIP) “VIP THE-PL” between the German market area (Trading Hub Europe – THE) and the Polish entry-exit system (comprising the Polish national transmission system and the TGPS transit pipeline system) will be established effective 1 January 2027, 06:00 CET. The VIP will be created by merging the existing interconnection points Mallnow and GCP GAZ-SYSTEM/ONTRAS. ONTRAS Gastransport GmbH will market capacities on the German side of the VIP. All capacities contracted with ONTRAS at GCP GAZ-SYSTEM/ONTRAS up to this date will be transferred to VIP THE-PL as of 1 January 2027, 06:00 CET." | |
| NaTran | — | — | — | 22 May 2026 → 01 Jan 2028 | — | — | To preserve network safety, constraints are applied on the network operations. The limits are therefore reduced as follows: -SN1/SN0: 70 GWh -SN3/SN4: 30 GWh -NS3/EO2/NS4/S1: 10 GWh | |
| Conexus Baltic Grid JSC | — | — | — | 01 May 2026 → 01 May 2027 | — | — | IUGS technical capacity for 2026./2027. years cycle is 24 405 300 000 kWh | |
| GASCADE Gastransport GmbH | — | — | — | 21 Apr 2026 → 09 Oct 2026 | — | — | Maintenance works for GASCADE Gastransport GmbH: Cancellation of IDs 2026-009 and 2026-010. The updated overview can be found under the following link: https://tron.gascade.biz/ | |
| terranets bw GmbH | — | — | — | 01 Jan 2026 → 01 Jan 2027 | — | — | The network fees for firm freely allocable capacities with a term of one gas year are 7,06 €/(kWh/h)/a in the Trading Hub Europe GmbH market area, valid from 1 January 2026 until 1 January 2027. The fees result from the BNetzA decision BK9-23/610 (REGENT 2026). | |
| Open Grid Europe GmbH | — | — | — | 01 Jan 2026 → 01 Jan 2027 | — | — | OGE publishes network fees for 2026 (MA THE) - The network fees for firm freely allocable capacities with a term of one gas year are 7.06 €/(kWh/h)/a in the Trading Hub Europe GmbH market area, valid from 1 January 2026 until 1 January 2027. | |
| Gasunie Deutschland Transport Services GmbH | — | — | — | 01 Jan 2026 → 01 Jan 2027 | — | — | GUD publishes network fees for 2026 (MA THE)The network fees for firm freely allocable capacities with a term of one gas year are 7.06 €/(kWh/h)/a in the Trading Hub Europe GmbH market area, valid from 1 January 2026 until 1 January 2027.The fees result from the BNetzA decision BK9-23/610 (REGENT 2026). | |
| NaTran Deutschland | VIP France Germany | Entry | Unplanned | Transmission system unavailability | 01 Jan 2026 → 01 Jan 2027 | 0.00 MSm³/d | 0.00 MSm³/d | Die Entgelte ergeben sich gemäß der Festlegung der BNetzA BK9-23/610 (REGENT 2026).The fees result from the BNetzA decision BK9-23/610 (REGENT 2026). |
| NaTran Deutschland | VIP France Germany | Exit | Unplanned | Transmission system unavailability | 01 Jan 2026 → 01 Jan 2027 | 0.00 MSm³/d | 0.00 MSm³/d | Die Entgelte ergeben sich gemäß der Festlegung der BNetzA BK9-23/610 (REGENT 2026).The fees result from the BNetzA decision BK9-23/610 (REGENT 2026). |
| GASCADE Gastransport GmbH | — | — | — | 01 Jan 2026 → 01 Jan 2027 | — | — | Die Netzentgelte für eine feste frei zuordenbare Kapazität mit einer Laufzeit von einem Jahr belaufen sich für das Marktgebiet TRADING HUB EUROPE auf 7,06 €/kWh/h/a mit Wirkung ab dem 01.01.2026.The fees for firm and free assignable capacity with a booking period of one year amount to 7,06 €/kWh/h/a for the TRADING HUB EUROPE market area with effect from 01.01.2026. | |
| NEL Gastransport GmbH | — | — | — | 01 Jan 2026 → 01 Jan 2027 | — | — | Die Netzentgelte für eine feste frei zuordenbare Kapazität mit einer Laufzeit von einem Jahr belaufen sich für das Marktgebiet TRADING HUB EUROPE auf 7,06 €/kWh/h/a mit Wirkung ab dem 01.01.2026.The fees for firm and free assignable capacity with a booking period of one year amount to 7,06 €/kWh/h/a for the TRADING HUB EUROPE market area with effect from 01.01.2026. | |
| Open Grid Europe GmbH | — | — | — | 01 Jan 2026 → 01 Jan 2027 | — | — | OGE publishes biogas levy 2026 - The German-wide levy 2026 according to Cooperation Agreement is for biogas 1.3268 €/(kWh/h)/a. | |
| Open Grid Europe GmbH | — | — | — | 01 Jan 2026 → 01 Jan 2027 | — | — | OGE publishes market area conversion levy 2026 - The German-wide levy 2026 according to Cooperation Agreement is for market area conversion 0.7189 €/(kWh/h)/a. | |
| NET4GAS | — | — | — | 01 Jan 2026 → 01 Jan 2027 | — | — | An initial outage plan for year 2026 has been published | |
| NaTran | PS000SA | Exit | Unplanned | Transmission system unavailability | 28 Nov 2025 → 31 Dec 2026 | 0.48 MSm³/d | 0.74 MSm³/d | From the GD of 28/11/2025, a reduction of the exit capacity for PITS Sud Est might be applied. This reduction could reach a maximum of 5 GWh/d. |
| Fluxys TENP GmbH | — | — | — | 31 Oct 2025 → 31 Dec 2099 | — | — | Düsseldorf, 31.10.2025 – 14:15 Fluxys TENP has activated the function to transfer nomination rights from an already existing "Transfer of Use"-deal to a further third party by means of a second "Transfer of Use"-deal on PRISMA. All involved parties must be registered with Fluxys TENP on PRISMA. Please contact us at "dispatching.fluxystenp@fluxys.com" in case of any question you may have. Düsseldorf, 31.10.2025 – 14:15 Fluxys TENP hat auf PRISMA die Möglichkeit aktiviert, Nominierungsrechte aus einem bereits bestehenden Übertragungsvertrag ("Transfer of Use") durch einen zweiten Übertragungsvertrag auf eine dritte Partei zu übertragen. Alle involvierten Parteien müssen dafür bei Fluxys TENP auf PRISMA registriert sein. Bei Fragen kontaktieren Sie uns gerne unter "dispatching.fluxystenp@fluxys.com". | |
| NaTran | SPNS2U | Entry | Unplanned | Compressor station unavailability | 02 May 2025 → 01 Jan 2027 | 0.00 MSm³/d | 95.13 MSm³/d | Increase of the risk of call for tenders on the locational product on these limits during this period |
| Conexus Baltic Grid JSC | — | — | — | 01 Jan 2025 → 01 Jan 2035 | — | — | Default long-term injection and withdrawal capacities for Inčukalns UGS have been updated | |
| GASCADE Gastransport GmbH | — | — | — | 23 Dec 2024 → 01 Jan 2027 | — | — | As of 23.12.2024 06:00 CET Fluxys Deutschland GmbH (Fluxys) and GASCADE Gastransport GmbH (GASCADE) will offer additional 4,000,000 kWh/h dynamically allocable capacity (DZK) at the LNG Entry point Baltic Energy Gate (EIC 37Z000000008921D), operated by Fluxys and GASCADE, with allocation restriction to Exit Mallnow (EIC 21Z000000000056S) and Exit VIP Brandov (EIC 21Z0000000004863). Fluxys will offer 25% of the additional capacity, GASCADE 75%. You can find all capacity information in the transparency section Fluxys’ and GASCADEs' websites. | |
| Fluxys Deutschland GmbH | — | — | — | 23 Dec 2024 → 01 Jan 2027 | — | — | As of 23.12.2024 06:00 CET Fluxys Deutschland GmbH (Fluxys) and GASCADE Gastransport GmbH (GASCADE) will offer additional 4,000,000 kWh/h dynamically allocable capacity (DZK) at the LNG Entry point Baltic Energy Gate (EIC 37Z000000008921D) Entry, operated by Fluxys and GASCADE, with allocation restriction to Exit Mallnow (EIC 21Z000000000056S) and Exit VIP Brandov (EIC 21Z0000000004863). Fluxys will offer 25% of the additional capacity, GASCADE 75%. You can find all capacity information in the transparency section Fluxys’ and GASCADE’s websites. | |
| terranets bw GmbH | RC Basel | Exit | Planned | Other unavailability | 01 Oct 2024 → 01 Oct 2030 | 0.01 MSm³/d | 0.04 MSm³/d | terranets bw will reduce the exit capacity at IP Basel beginning from October 1st 2024 permanently by 102222 kWh/h. The reason for this is a national obligation by the NRA to reallocate capacities for upcoming auctions. |
| GASCADE Gastransport GmbH | — | — | — | 01 Oct 2024 → 01 Oct 2029 | — | — | GASCADE will change the technical capacities for the network points Mallnow and VIP Brandov starting from 01 October 2024 06:00 a.m. (CET) which will be the basis for the capacity offer at those points in the Annual Yearly Auction 2024.For further information please refer to the publication on GASCADE’s transparency platform (https://tron.gascade.biz/?language=en) as well as on the ENTSOG TP. | |
| GASCADE Gastransport GmbH | — | — | — | 01 Oct 2024 → 01 Oct 2029 | — | — | In the Annual Yearly Auction 2024, GASCADE will offer technical capacities for the network point Greifswald (former Greifswald OPAL point) starting from 01 October 2024 06:00 a.m. (CET). | |
| Elering AS | Värska Entry | Entry | Planned | Transmission system unavailability | 30 Dec 2022 → 31 Dec 2029 | 4.01 MSm³/d | 4.01 MSm³/d | Not new UMM, original from https://umm.getbaltic.com/public-umm/3470 |
| Elering AS | — | — | — | 23 Sept 2022 → 27 Apr 2031 | — | — | The technical maximum capacity of the Paldiski LNG entry point will be between 90 GWh and 120GWh during normal operation. The normal operating capacity is dependent on the Finnish and Estonian consumption levels and Latvian network regimes. This is not new UMM, original https://umm.getbaltic.com/public-umm/3128 | |
| Open Grid Europe | — | — | — | 01 Oct 2021 → 01 Jan 2030 | — | — | Reduction of firm capacities for yearly auction (01.07.2019): OGE will not offer any firm freely allocable capacities at entry points (Entry-FZK) within the H-Gas market area in the yearly auction from 01.10.2021 onwards. Only interruptible capacities at entry points will be offered for a period of five years. | |
| Open Grid Europe | — | — | — | 01 Oct 2021 → 01 Jan 2030 | — | — | Reduction of capacities for yearly auction (01.07.2019): Open Grid Europe will not offer any conditionally firm freely allocable capacities at entry points (Entry-bFZK) at Virtual Interconnection Points. This limitation refers to capacities within the H-Gas market area for the period starting on 01.10.2021. |
Subscribe to Access
Get full access to real-time European gas flow data, LNG terminals, market prices and more.
View Plans & Start Free Trial7-day free trial · No credit card required upfront















